My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Street sweeping shall start at the beginning of clearing and grubbing and shall continue until completion of the project,or <br /> as directed by the Engineer. Street sweeping shall be performed immediately after soil disturbing activities occur or offsite <br /> tracking of material is observed. Street sweeping shall be performed so that dust is minimized. If dust generation is <br /> excessive or sediment pickup is ineffective as determined by the Engineer,the use of water or a vacuum will be required. <br /> At the option of the Contractor, collected material may be temporarily stockpiled in accordance with the approved <br /> WPCP. Collected material shall be disposed of at least once per week. <br /> Material collected during street sweeping operations shall be disposed of in conformance with Section 7-1.13, "Disposal <br /> of Material Outside The Highway Right Of Way,"of the Standard Specifications. <br /> MEASUREMENT AND PAYMENT <br /> The contract lump sum price paid for street sweeping shall include full compensation for furnishing all labor, materials, <br /> tools, equipment, and incidentals and for doing all the work involved in street sweeping, including disposal of collected <br /> material, as shown on the plans, as specified in the Standard Specifications, these special provisions, and as directed by the <br /> Engineer. <br /> 10-1.05 TEMPORARY CONCRETE WASHOUT(PORTABLE) <br /> A portable temporary concrete washout shall be furnished,maintained, and removed as specified in the approved Water <br /> Pollution Control Program in conformance with"Water Pollution Control' of these special provisions and as directed by the <br /> Engineer. <br /> A portable temporary concrete washout shall consist of a commercially available drum at a minimum size of 208-liter or <br /> alternate container upon written approval from the Engineer. The drum shall be stenciled "Concrete Waste Material." The <br /> letters shall be black and 100 mm in height on a white background. The top of the stenciling shall be 300 mm from the top of <br /> the barrel. <br /> PLACEMENT <br /> A portable temporary concrete washout shall be as follows: <br /> A. A portable temporary concrete washout shall be in place prior to placement of concrete and shall be located in the <br /> immediate area of the concrete work as approved by the Engineer. The temporary concrete washout shall be located <br /> away from construction traffic or public access areas. After initial placement,temporary concrete washout shall be <br /> moved as needed for concrete construction work. When the temporary concrete washout is no longer required, as <br /> determined by the Engineer, it shall be removed and disposed of in conformance with the provisions in <br /> Section 7-1.13,"Disposal of Material Outside the Highway Right of Way,"of the Standard Specifications. <br /> B. A sign shall be installed adjacent to each washout at a location determined by the Contractor and approved by the <br /> Engineer. Signs shall be installed in conformance with the provisions in Section 12-3.06B, "Portable Signs" of the <br /> Standard Specifications. Each portable sign shall consist of a base, framework and a sign panel. The sign panel <br /> shall be made out of plywood and shall have a minimum size of 610 mm by 1200 mm. The sign panel shall read <br /> "Concrete Washout"with black letters, 150 mm in height,on a white background. <br /> C. The Contractor shall provide sufficient temporary concrete washout capacity to contain liquid and concrete waste <br /> generated by washout operations without seepage or spills. <br /> Maintaining the portable temporary concrete washout shall include removing and disposing of concrete waste. Concrete <br /> waste material generated shall be removed each day and disposed of in conformance with the provisions in Section 7-1.13, <br /> "Disposal of Material Outside the Highway Right of Way"of the Standard Specifications. <br /> The Contractor shall provide the name and location of the disposal facility to the Engineer before disposal of solid and <br /> liquid concrete waste. The Contractor shall provide verification that the off-site commercial or noncommercial disposal site <br /> has a permit issued by the California Regional Water Quality Control Board(RWQCB). If the disposal site is located outside <br /> of the State of California, the Contractor shall provide a copy of the permit issued by the state or local agency having <br /> jurisdiction over the disposal site. <br /> When relocating or transporting a portable temporary concrete washout, the portable washout shall be properly secured <br /> to prevent spilling of concrete waste material. <br /> PAYMENT <br /> The contract lump sum price paid for temporary concrete washout (portable) shall include full compensation for <br /> furnishing all labor, materials, tools, equipment, including the sign, and incidentals, and for doing all the work involved in <br /> furnishing, placing, maintaining, repairing, replacing, transporting, disposing of concrete waste, and removing the washout, <br /> as specified in the Standard Specifications and these special provisions,and as directed by the Engineer. <br /> Contract No. 10-OM7104 <br /> 145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.