REMOVAL
<br /> n is no longer required the protection materials shall be removed an
<br /> When the temporary drainage inlet protectio
<br /> disposed of in accordance with the provisions in Section 7-1.13, "Disposal of Material Outside the Highway RightfY,"
<br /> of the Standard Specifications. a inlet protection shall be
<br /> Holes,depressions,or other ground disturbance caused by the removal of the temporary drainage
<br /> backfilled and repaired in accordance with the provisions in Section 15-1.02, "Preservation of Property," of the Standard
<br /> Specifications.
<br /> MEASUREMENT
<br /> will be determined from actual count in place. The protection will e
<br /> Quantities of temporary drainage inlet protection
<br /> measured one time only and no additional measurement will be recognized.
<br /> PAYMENT
<br /> The contract unit price paid for temporary drainage inlet protection shall include full compensation for furnishing al
<br /> labor,materials,tools,equipment,and incidentals,and foCainage
<br /> doing rmova of materials,lin hiding clved in eanup and dispcting the oosal ofrary retained
<br /> inlet protection, complete in place,including ma holes,depressions and other ground disturbance,as shown on the plans,as
<br /> sediment and debris,and backfilling and repairing
<br /> specified in the Standard Specifications and these special provisions,and as directed by the Engineer. the course of
<br /> No additional compensation will be made if the temporary drainage inlet protection changes during
<br /> construction.
<br /> 10-1.07 OBSTRUCTIONS
<br /> ility and Non-Highway Facilities," and Section 15, "Existing Highway
<br /> Attention is directed to Section 8-1.10, "Ut
<br /> Facilities,"of the Standard Specifications and these special provisions.
<br /> The Contractor shall notify the Engineer and the appropriate regionanotificationotoing any excavation or other work
<br /> installations at least 2 working days,but not more than 14 calendar days,p P
<br /> close to any underground Pipeline, conduit, duct,wire or other structure. Regional notification centers include,but are not
<br /> limited to,the following:
<br /> Notification Center Tele hone Number
<br /> Underground Service Alert Northern California(USA) 1-800-642-2444
<br /> 1-800-227-2600
<br /> Underground Service Alert-Southern California(USA) 1-800-422-4133
<br /> 1-800-227-2600
<br /> 10-1.08 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES d, and when
<br /> Flagging, signs, and temporary traffic controle ices finnishedionArea installed, maintaine
<br /> raffic Control Devices," of f thenStandard
<br /> required shall conform to the provisions m Se
<br /> ctionSpecifications and these special provisions.
<br /> vices. These
<br /> Category 1 temporary traffic control devices are define
<br /> cd h ten aof similardevices, or years 5o d demonstrable safe
<br /> b crash testing, g portable delineators and
<br /> devices shall be certified as crashworthy y plastic drums,
<br /> channelizers.
<br /> performance. Category 1 temporary traffic control devices include traffic cones, p
<br /> s of
<br /> egory 1
<br /> If requested by the Engineer, the Contractor shall provide writann sevlof-k using the devicescertification for or withins2 days after the
<br /> temporary traffic control devices at least 5 days before beginning y
<br /> If-certification shall be provided by the manufacturer or Contractor and shall
<br /> request if the devices are already in use. Se
<br /> include the following:
<br /> A. Date,
<br /> B. Federal Aid number(if applicable),
<br /> C. Contract number,district,county,route and kilometer post of project limits,
<br /> D. Company name of certifying vendor,street address city,state and zip code,
<br /> E. Printed name,signature and title of certifying person;and
<br /> F. Category 1 temporary traffic control devices that will be used on the project.
<br /> The Contractor may obtain a standard form for self-certification from the Engineer.
<br /> Contract No. 10-OM7104
<br /> 148