Laserfiche WebLink
REMOVAL <br /> n is no longer required the protection materials shall be removed an <br /> When the temporary drainage inlet protectio <br /> disposed of in accordance with the provisions in Section 7-1.13, "Disposal of Material Outside the Highway RightfY," <br /> of the Standard Specifications. a inlet protection shall be <br /> Holes,depressions,or other ground disturbance caused by the removal of the temporary drainage <br /> backfilled and repaired in accordance with the provisions in Section 15-1.02, "Preservation of Property," of the Standard <br /> Specifications. <br /> MEASUREMENT <br /> will be determined from actual count in place. The protection will e <br /> Quantities of temporary drainage inlet protection <br /> measured one time only and no additional measurement will be recognized. <br /> PAYMENT <br /> The contract unit price paid for temporary drainage inlet protection shall include full compensation for furnishing al <br /> labor,materials,tools,equipment,and incidentals,and foCainage <br /> doing rmova of materials,lin hiding clved in eanup and dispcting the oosal ofrary retained <br /> inlet protection, complete in place,including ma holes,depressions and other ground disturbance,as shown on the plans,as <br /> sediment and debris,and backfilling and repairing <br /> specified in the Standard Specifications and these special provisions,and as directed by the Engineer. the course of <br /> No additional compensation will be made if the temporary drainage inlet protection changes during <br /> construction. <br /> 10-1.07 OBSTRUCTIONS <br /> ility and Non-Highway Facilities," and Section 15, "Existing Highway <br /> Attention is directed to Section 8-1.10, "Ut <br /> Facilities,"of the Standard Specifications and these special provisions. <br /> The Contractor shall notify the Engineer and the appropriate regionanotificationotoing any excavation or other work <br /> installations at least 2 working days,but not more than 14 calendar days,p P <br /> close to any underground Pipeline, conduit, duct,wire or other structure. Regional notification centers include,but are not <br /> limited to,the following: <br /> Notification Center Tele hone Number <br /> Underground Service Alert Northern California(USA) 1-800-642-2444 <br /> 1-800-227-2600 <br /> Underground Service Alert-Southern California(USA) 1-800-422-4133 <br /> 1-800-227-2600 <br /> 10-1.08 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES d, and when <br /> Flagging, signs, and temporary traffic controle ices finnishedionArea installed, maintaine <br /> raffic Control Devices," of f thenStandard <br /> required shall conform to the provisions m Se <br /> ctionSpecifications and these special provisions. <br /> vices. These <br /> Category 1 temporary traffic control devices are define <br /> cd h ten aof similardevices, or years 5o d demonstrable safe <br /> b crash testing, g portable delineators and <br /> devices shall be certified as crashworthy y plastic drums, <br /> channelizers. <br /> performance. Category 1 temporary traffic control devices include traffic cones, p <br /> s of <br /> egory 1 <br /> If requested by the Engineer, the Contractor shall provide writann sevlof-k using the devicescertification for or withins2 days after the <br /> temporary traffic control devices at least 5 days before beginning y <br /> If-certification shall be provided by the manufacturer or Contractor and shall <br /> request if the devices are already in use. Se <br /> include the following: <br /> A. Date, <br /> B. Federal Aid number(if applicable), <br /> C. Contract number,district,county,route and kilometer post of project limits, <br /> D. Company name of certifying vendor,street address city,state and zip code, <br /> E. Printed name,signature and title of certifying person;and <br /> F. Category 1 temporary traffic control devices that will be used on the project. <br /> The Contractor may obtain a standard form for self-certification from the Engineer. <br /> Contract No. 10-OM7104 <br /> 148 <br />