My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
test batch concrete under slung will not be required. In addition to meeting the specified nominal penetration,the test batch <br /> shall meet the following requirements: <br /> A. For piles where the time required for each concrete placing operation, as submitted in the placing plan, will be <br /> 2 hours or less, the test batch shall demonstrate that the proposed concrete mix design achieves either a penetration <br /> of at least 50 mm or a slump of at least 125 mm after twice that time has elapsed. <br /> B. For piles where the time required for each concrete placing operation,as submitted in the placing plan,will be more <br /> than 2 hours,the test batch shall demonstrate that the proposed concrete mix design achieves either a penetration of <br /> at least 50 mm or a slump of at least 125 mm after that time plus 2 hours has elapsed. <br /> The time period shall begin at the start of placement. The concrete shall not be vibrated or agitated during the test <br /> period. Penetration tests shall be performed in conformance with the requirements in California Test 533. Slump tests shall <br /> be performed in conformance with the requirements in ASTM Designation: C 143. Upon completion of testing,the concrete <br /> shall be disposed of in conformance with the provisions in Section 7-1.13, "Disposal of Material Outside the Highway Right <br /> of Way,"of the Standard Specifications. <br /> The concrete deposited under slurry shall be carefully placed in a compact, monolithic mass and by a method that will <br /> prevent washing of the concrete. Concrete deposited under slung need not be vibrated. Placing concrete shall be a <br /> continuous operation lasting not more than the time required for each concrete placing operation at each pile,as submitted in <br /> the placing plan, unless otherwise approved in writing by the Engineer. The concrete shall be placed with concrete pumps <br /> and delivery tube system of adequate number and size to complete the placing of concrete in the time specified. The delivery <br /> tube system shall consist of one of the following: <br /> A. A tremie tube or tubes,each of which are at least 250 mm in diameter, fed by one or more concrete pumps. <br /> B. One or more concrete pump tubes,each fed by a single concrete pump. <br /> The delivery tube system shall consist of watertight tubes with sufficient rigidity to keep the ends always in the mass of <br /> concrete placed. If only one delivery tube is utilized to place the concrete, the tube shall be placed near the center of the <br /> drilled hole. Multiple tubes shall be uniformly spaced in the hole. Internal bracing for the steel reinforcing cage shall <br /> accommodate the delivery tube system. Tremies shall not be used for piles without space for a 250-mm tube. <br /> Spillage of concrete into the slurry during concrete placing operations shall not be allowed. Delivery tubes shall be <br /> capped with a watertight cap,or plugged above the slung level with a good quality,tight fitting,moving plug that will expel <br /> the slurry from the tube as the tube is charged with concrete. The cap or plug shall be designed to be released as the tube is <br /> charged. The pump discharge or tremie tube shall extend to the bottom of the hole before charging the tube with concrete. <br /> After charging the delivery tube system with concrete,the flow of concrete through a tube shall be induced by slightly raising <br /> the discharge end. During concrete placement, the tip of the delivery tube shall be maintained as follows to prevent reentry <br /> of the slurry into the tube. Until at least 3 in of concrete has been placed,the tip of the delivery tube shall be within 150 mm <br /> of the bottom of the drilled hole, and then the embedment of the tip shall be maintained at least 3 in below the top surface of <br /> the concrete. Rapid raising or lowering of the delivery tube shall not be permitted. If the seal is lost or the delivery tube <br /> becomes plugged and must be removed, the tube shall be withdrawn, the tube cleaned,the tip of the tube capped to prevent <br /> entrance of the slurry, and the operation restarted by pushing the capped tube 3 in into the concrete and then reinitiating the <br /> flow of concrete. <br /> When slurry is used, a fully operational standby concrete pump, adequate to complete the work in the time specified, <br /> shall be provided at the site during concrete placement. The slung level shall be maintained within 300 mm of the top of the <br /> drilled hole. <br /> A log of concrete placement for each drilled hole shall be maintained by the Contractor when concrete is deposited under <br /> slurry. The log shall show the pile location, tip elevation, dates of excavation and concrete placement, total quantity of <br /> concrete deposited, length and tip elevation of any casing, and details of any hole stabilization method and materials used. <br /> The log shall include a 215 mm x 280 mm sized graph of the concrete placed versus depth of hole filled. The graph shall be <br /> plotted continuously throughout placing of concrete. The depth of drilled hole filled shall be plotted vertically with the pile <br /> tip oriented at the bottom and the quantity of concrete shall be plotted horizontally. Readings shall be made at least at each <br /> 1.5 in of pile depth, and the time of the reading shall be indicated. The graph shall be labeled with the pile location, tip <br /> elevation, cutoff elevation, and the dates of excavation and concrete placement. The log shall be delivered to the Engineer + <br /> within one working day of completion of placing concrete in the pile. <br /> After placing reinforcement and prior to placing concrete in the drilled hole, if drill cuttings settle out of the slurry, the <br /> bottom of the drilled hole shall be cleaned. The Contractor shall verify that the bottom of the drilled hole is clean. <br /> If temporary casing is used,concrete placed under slurry shall be maintained at a level at least 1.5 in above the bottom of <br /> the casing. The withdrawal of casings shall not cause contamination of the concrete with slung. <br /> Contract No. 10-OM7104 <br /> 165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.