My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION8-3. WELDING..............................................................................................................................................127 <br /> 8-3.01 WELDING....................................................................................................................................................127 <br /> WELDINGQUALITY CONTROL...................................................................................................................130 <br /> WELDINGFOR POLE STRUCTURES...........................................................................................................132 <br /> PAYMENT.........................................................................................................................................................133 <br /> SECTION 9. BLANK 133 <br /> SECTION 10. CONSTRUCTION DETAILS................................................................................................................. <br /> 9. (BLANK)...................................................................................................................................................133 <br /> SECTION10-1. GENERAL............................................................................................................................................133 <br /> 10-1.01 ORDER OF WORK....................................................................................................................................133 <br /> 10-1.02 WATER POLLUTION CONTROL............................................................................................................133 <br /> GENERAL.................................................................................................................I.......................................133 <br /> WATER POLLUTION CONTROL PROGRAM..............................................................................................134 <br /> IMPLEMENTATIONREQUIREMENTS.........................................................................................................135 <br /> INSPECTIONAND MAINTENANCE.............................................................................................................135 <br /> REPORTINGREQUIREMENTS......................................................................................................................136 <br /> PAYMENT.........................................................................................................................................................136 <br /> 10-1.03 CONSTRUCTION SITE MANAGEMENT...............................................................................................136 <br /> SPILLPREVENTION AND CONTROL..........................................................................................................137 <br /> MATERIALMANAGEMENT..........................................................................................................................138 <br /> WASTEMANAGEMENT................................................................................................................................139 <br /> NON-STORM WATER MANAGEMENT.......................................................................................................142 <br /> DEWATERING.................................................................................................................................................144 <br /> PAYMENT.........................................................................................................................................................144 <br /> 10-1.04 STREET SWEEPING.................................................................................................................................144 <br /> 10-1.05 TEMPORARY CONCRETE WASHOUT(PORTABLE).........................................................................145 <br /> 10-1.06 TEMPORARY DRAINAGE INLET PROTECTION................................................................................146 <br /> 10-1.07 OBSTRUCTIONS.......................................................................................................................................148 <br /> 10-1.08 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES....................................................................148 <br /> 10-1.09 CONSTRUCTION AREA SIGNS..............................................................................................................149 <br /> 10-1.10 MAINTAINING TRAFFIC........................................................................................................................150 <br /> 10-1.11 CLOSURE REQUIREMENTS AND CONDITIONS................................................................................153 <br /> 10-1.12 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE.........................................................................154 <br /> 10-1.13 PORTABLE CHANGEABLE MESSAGE SIGN.......................................................................................154 <br /> 10-1.14 TEMPORARY CRASH CUSHION MODULE.........................................................................................155 <br /> 10-1.15 EXISTING HIGHWAY FACILITIES........................................................................................................156 <br /> REMOVEPAVEMENT MARKER..................................................................................................................156 <br /> REMOVE TRAFFIC STRIPE AND PAVEMENT MARKING.......................................................................156 <br /> REMOVEROADSIDE SIGN............................................................................................................................157 <br /> REMOVEROADSIDE SIGN PANEL..............................................................................................................157 <br /> 10-1.16 PILING........................................................................................................................................................157 <br /> GENERAL.........................................................................................................................................................157 <br /> CAST-IN-DRILLED-HOLE CONCRETE PILES............................................................................................157 <br /> 10-1.17 STEEL STRUCTURES..............................................................................................................................168 <br /> MATERIALS.....................................................................................................................................................168 <br /> ROTATIONAL CAPACITY TESTING PRIOR TO SHIPMENT TO JOB SITE............................................168 <br /> INSTALLATION TENSION TESTING AND ROTATIONAL CAPACITY TESTING AFTER ARRIVAL ON <br /> THEJOB SITE...................................................................................................................................................172 <br /> SURFACEPREPARATION............................................................................................11.11.............................173 <br /> WELDING ...............173 <br /> ......................................................................................................................... <br /> PAYMENT.........................................................................................................................................................173 <br /> 10-1.18 ROADSIDE SIGNS..................................................................................................111..1............................173 <br /> 10-1.19 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST..................................................................173 <br /> 10-1.20 FURNISH SIGN..........................................................................................................................................173 <br /> SHEETALUMINUM........................................................................................................................................175 <br /> RETROREFLECTIVESHEETING...................................................................................................................175 <br /> PROCESSCOLOR AND FILM........................................................................................................................175 <br /> SINGLESHEET ALUMINUM SIGN...............................................................................................................176 <br /> FIBERGLASS REINFORCED PLASTIC PANEL SIGN.................................................................................176 <br /> MEASUREMENTAND PAYMENT................................................................................................................176 <br /> Contract No. 10-OM7104 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.