• The contract price paid per meter for cast-in-drilled-hole concrete piling shall include full compensation for <br /> furnishing all labor,materials,tools, equipment, and incidentals,and for doing all work involved in drilling holes, disposing <br /> of material resulting from drilling holes, temporarily casing holes and removing water when necessary, furnishing and <br /> placing concrete and reinforcement, and constructing reinforced concrete extensions, complete in place, to the required <br /> penetration, as shown on the plans, as specified in these specifications and in the special provisions, and as directed by the <br /> Engineer. <br /> The seventh paragraph in Section 49-6.02,"Payment,"of the Standard Specifications is amended to read <br /> • The contract unit price paid for drive pile shall include full compensation for furnishing all labor, materials,tools, <br /> equipment,and incidentals,and for doing all the work involved in driving timber,concrete and steel piles,driving steel shells <br /> for cast-in-place concrete piles,placing filling materials for cast-in-place concrete piles and cutting off piles, all complete in <br /> place to the required nominal resistance and penetration as shown on the plans and as specified in these specifications and the <br /> special provisions,and as directed by the Engineer. <br /> The ninth paragraph in Section 49-6.02,"Payment,"of the Standard Specifications is amended to read: <br /> • Full compensation for all jetting, drilling,providing special driving tips or heavier sections for steel piles or shells, <br /> or other work necessary to obtain the specified penetration and nominal resistance of the piles, for predrilling holes through <br /> embankment and filling the space remaining around the pile with sand or pea gravel, for disposing of material resulting from <br /> jetting,drilling or predrilling holes,and for all excavation and backfill involved in constructing concrete extensions as shown <br /> on the plans, and as specified in these specifications and the special provisions, and as directed by the Engineer shall be <br /> considered as included in the contract unit price paid for drive pile or in the contract price paid per meter for <br /> cast-in-drilled-hole concrete piling,and no additional compensation will be allowed therefor. <br /> Section 49-6.02, "Payment,"of the Standard Specifications is amended by adding the following paragraphs: <br /> • Full compensation for furnishing and placing additional testing reinforcement, for load test anchorages, and for <br /> cutting off test piles, shall be considered as included in the contract price paid for piling of the type or class shown in the <br /> Engineer's Estimate,and no additional compensation will be allowed. <br /> • No additional compensation or extension of time will be made for additional foundation investigation, installation <br /> and testing of indicator piling,cutting off piling and restoring the foundation investigation and indicator pile sites,and review <br /> of request by the Engineer. <br /> SECTION 50: PRESTRESSING CONCRETE <br /> Issue Date: January 5,2007 <br /> Section 50-1.02, "Drawings," of the Standard Specifications is amended by adding the following paragraph after the <br /> second paragraph: <br /> • Each working drawing submittal shall consist of plans for a single bridge or portion thereof. For multi-frame <br /> bridges,each frame shall require a separate working drawing submittal. <br /> The eighth paragraph of Section 50-1.02, "Drawings,"of the Standard Specifications is deleted. <br /> Section 50-1.05, "Prestressing Steel,"of the Standard Specifications is amended to read: — <br /> • Prestressing steel shall be high-tensile wire conforming to the requirements in ASTM Designation: A 421,including <br /> Supplement 1; high-tensile seven-wire strand conforming to the requirements in ASTM Designation: A 416; or uncoated <br /> high-strength steel bars conforming to the requirements in ASTM Designation: A 722, including all supplementary <br /> requirements. The maximum mass requirement of ASTM Designation: A 722 will not apply. <br /> In addition to the requirements of ASTM Designation: A 722, for deformed bars, the reduction of area shall be <br /> determined from a bar from which the deformations have been removed. The bar shall be machined no more than necessary <br /> to remove the deformations over a length of 300 mm,and reduction will be based on the area of the machined portion. <br /> Contract No. 10-OM7104 <br /> 25 <br />