• No separate payment will be made for pretensioning precast concrete members. Payment for pretensioning precast <br /> concrete members shall be considered as included in the contract price paid for furnish precast members as provided for in <br /> Section 51, "Concrete Structures." <br /> The second paragraph in Section 50-1.11,"Payment,"of the Standard Specifications is amended to read: <br /> • The contract lump sum prices paid for prestressing cast-in-place concrete of the types listed in the Engineer's <br /> Estimate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing <br /> all work involved in furnishing,placing,and tensioning the prestressing steel in cast-in-place concrete structures,complete in <br /> place,as shown on the plans,as specified in these specifications and the special provisions,and as directed by the Engineer. <br /> SECTION 51: CONCRETE STRUCTURES <br /> Issue Date: January 5,2007 <br /> The eleventh paragraph in Section 51-1.05,"Forms,"of the Standard Specifications is amended to read: <br /> • Form panels for exposed surfaces shall be furnished and placed in uniform widths of not less than 0.9-m and in <br /> uniform lengths of not less than 1.8 in, except at the end of continuously formed surfaces where the final panel length <br /> required is less than 1.8 in. Where the width of the member formed is less than 0.9-m, the width of the panels shall be not <br /> less than the width of the member. Panels shall be arranged in symmetrical patterns conforming to the general lines of the <br /> structure. Except when otherwise provided herein or shown on the plans,panels for vertical surfaces shall be placed with the <br /> long dimension horizontal and.with horizontal joints level and continuous. Foran panels for curved surfaces of columns shall <br /> be continuous for a minimum of one quarter of the circumference, or 1.8 in. For walls with sloping footings which do not <br /> abut other walls,panels may be placed with the long dimension parallel to the footing. Form panels on each side of the panel <br /> joint shall be precisely aligned,by means of supports or fasteners common to both panels,to result in a continuous unbroken <br /> concrete plane surface. When prefabricated soffit panels are used,form filler panels joining prefabricated panels shall have a <br /> uniform minimum width of 0.3-m and shall produce a smooth uniform surface with consistent longitudinal joint lines <br /> between the prefabricated panels. <br /> The first and second paragraph in Section 51-1.06A, "Falsework Design and Drawings," of the Standard Specifications <br /> are amended to read: <br /> • The Contractor shall submit to the Engineer working drawings and design calculations for falsework proposed for <br /> use at bridges. For bridges where the height of any portion of the falsework,as measured from the ground line to the soffit of <br /> the superstructure, exceeds 4.25 in; or where any individual falsework clear span length exceeds 4.85 in; or where provision <br /> for vehicular,pedestrian, or railroad traffic through the falsework is made;the drawings shall be signed by an engineer who is <br /> registered as a Civil Engineer in the State of California. Six sets of the working drawings and 2 copies of the design <br /> calculations shall be furnished. Additional working drawings and design calculations shall be submitted to the Engineer <br /> when specified in "Railroad Relations and Insurance"of the special provisions. <br /> • The falsework drawings shall include details of the falsework erection and removal operations showing the methods <br /> and sequences of erection and removal and the equipment to be used. The details of the falsework erection and removal <br /> operations shall demonstrate the stability of all or any portions of the falsework during all stages of the erection and removal <br /> operations. <br /> The seventh paragraph in Section 51-1.06A, "Falsework Design and Drawings," of the Standard Specifications is <br /> amended to read: <br /> • In the event that several falsework plans are submitted simultaneously, or an additional plan is submitted for review <br /> before the review of a previously submitted plan has been completed, the Contractor shall designate the sequence in which <br /> the plans are to be reviewed. In such event, the time to be provided for the review of any plan in the sequence shall be not <br /> less than the review time specified above for that plan, plus 2 weeks for each plan of higher priority which is still under <br /> review. A falsework plan submittal shall consist of plans for a single bridge or portion thereof. For multi-frame bridges, <br /> each frame shall require a separate falsework plan submittal. <br /> Section 51-1.06A, "Falsework Design and Drawings,"of the Standard Specifications is amended by adding the following <br /> paragraphs: <br /> Contract No. 10-OM7104 <br /> 29 <br />