My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-08-311
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-08-311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:57:29 AM
Creation date
12/30/2015 9:42:59 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-311
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
WOODBRIDGE IRRIGATION DISTRICT
Contracts
CrossReference
Date Entered
10/1/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
WID CANAL ON LOWER SACRAMENTO RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Traffic Control Plan <br /> Woodbridge Irrigation District <br /> Replace Curb with Kneel Down Curb <br /> Project Description: Replace a standard stepped curb with a kneel down curb <br /> including saw cutting and removing a part of the side walk. The District will begin the <br /> work starting on December 3, 2007 and completed no later than December 7, 2007. <br /> Traffic Cones and Signage: <br /> Large orange traffic cones will be placed 25- 30 feet apart along the shoulder of the <br /> road delineating the work area with signage large 3 X 3 orange colored signage <br /> designating this as a construction area starting approximately 200 feet south of work area. <br /> A large sign at the end of the work area will placed on the north end of the bridge <br /> approximately 100 feet north of the work area. The work area consists of the side walk <br /> area, the pan of the existing sidewalk and curb. The solid lane line is approximately 6 <br /> feet from the existing curb. All equipment will be kept back of the side walk area and <br /> will not be in the traffic lane. <br /> Temporary Traffic Control (TTC) <br /> "Vehicles" <br /> No lane closures are needed for work periods, at the end of each work period, <br /> components of the traffic control system, including traffic cones and men working signs <br /> placed along open sidewalk area and adjacent to the traveled way, shall be removed from <br /> the traveled way and shoulder. Woodbridge will not store any of the components within <br /> the limits of the highway right of way. <br /> Pedestrian and Bicycle Traffic Utilizing Side Walk Area and Road Shoulder <br /> The District will use plating to cover the sidewalk section that is to be removed <br /> during non-construction periods. The District will provide a pedestrian escort and <br /> provide positive guidance to move pedestrian and bicycle traffic safely around the site. <br /> Coordination with other Jurisdiction Agencies. <br /> The District will notify the San Joaquin County Highway Department and Public <br /> Works Permitting and Encroachment Department 72 hours prior to the start of work and <br /> immediately after the work is completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.