My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0001 thru EP-08-0300_ - EP-08-0010 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-0001 thru EP-08-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0001 thru EP-08-0300_ - EP-08-0010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:48:13 AM
Creation date
12/30/2015 8:22:33 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-0010 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-0001 thru EP-08-0300
Year2
2008
Supplemental fields
Applicant
MOZINGO CONSTRUCTION, INC
Contracts
CrossReference
Date Entered
1/2/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
NILE ROAD 150 FT. E!O UNION ROAD. ONE LANE
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> �C'-stPj — —�f <br /> Bin DuBois <br /> From: Jacob Bejarano [bejarano@ecologic-eng.com] <br /> Sent: Friday, December 21, 2007 11:45 AM- <br /> To: Bill DuBois <br /> Cc: Mario Guadarnuz; Neal Colwell <br /> Subject: Lockeford Reclamation Project: Trench Waiver <br /> Attachments: Lockeford Enc Pmt Plans.pdf <br /> Bill, <br /> As discussed in our previous phone conversation, we will be submitting an encroachment permit for a project <br /> south of Lockeford. The project consists of installing reclamation piping in the County ROW to a newly acquired <br /> reclamation area on the east side of Tully Road. A generic scope of work is as follows: <br /> • Excavate approximately 510 ft(STA 19+33.55 to STA24+43.10) along the west Side of Tully Road <br /> . Install reclamation piping as shown on the drawings <br /> . Trench across Tully Road (STA 24+43 to STA 25+00) <br /> o Traffic Control Measures will be implemented (TBD & submitted at encroachment permit)to ensure <br /> the safety of oncorning traffic and construction workers. <br /> . All Backfill will be done in accordance to SJC standards (Drawing R-29) <br /> Tully Road has been overlayed a year or so ago so I was told that a waiver is needed to do the work described. <br /> Could you have look at the plans and let me know if the proposed work is acceptable for trenching? <br /> Thank you again and have a Mffry Christmas! <br /> Jacob <br /> Jacob ejarano, E.I.T. 41��5�� \ <br /> unior Engineer <br /> 2- <br /> ECOLOGIC Engineering �� ` <br /> 3520 Brookside Rd., Suite 141 <br /> Stockton, <br /> Phone: 9 242-0 :)( !-)7 <br /> Fax: (209) 461-6444 <br /> 12/21/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.