Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> t P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-0800356 <br /> STOCKTON, CALIFORNIA 95201 Date Issued: 02/11/2008 <br /> (209)468-3000 Exp. Date: 02/10/2009 <br /> FAX#(209)468-9324 Extension: <br /> Project No: PWPI 10005 <br /> APN No: 24014024 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: PASTOR OF ST BERNARD CHURCH COR <br /> 163 E EATON AVE <br /> TRACY CA 95376-3593 <br /> Location: 12100 W. VALPICO RD.; W/S OF CORRAL HOLLOW RD. 80' S/O VALPICO RD. <br /> In compliance with your request of 01/31/2008,and subject to all the terms, conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct three driveways w/o pipes shown on <br /> Permit Application No. PS-0800356 Quad: SW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear <br /> toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), ;Include flares for turning and/or paved frontage(s), from the edge of roadway pavement to <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch)Six inch minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along'wproperty line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be alloed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> Driveway(s) shall be complete prier to occupancy of the residence, <br /> but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> 'o pipe is required under and across driveway Department Public Works <br /> approach at this time. However, if in the future <br /> it is determined by the County that pipe will be <br /> required at this location,it shall be the responsi- By, <br /> bdity of the property owner to supply needed Permitction <br /> FORMS: SS/WW,R-17 pipe per County requirements, <br />