My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0448
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-0301 thru EP-08-0999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:49:27 AM
Creation date
12/30/2015 8:27:37 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-0448
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-0301 thru EP-08-0999
Year2
2008
Supplemental fields
Applicant
PG & E
Contracts
CrossReference
Date Entered
2/8/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF ROOSEVELT ST. 70' E/O WATERLOO RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(2/04) <br /> Sec. 10-1, Construction Details <br /> Std. Spec. Sec. 39 <br /> Special <br /> Page 3 of 3 <br /> Existing pavement markers shall be removed and disposed of, unless otherwise <br /> shown on the plans. <br /> During the removal of ceramic type pavement markers, screens or other <br /> protective devices shall be furnished to contain any fragments as provided for in <br /> Section 7-1.09, "Public Safety," of the Standard Specifications. <br /> Asphalt concrete used for advance leveling, as provided in Section 39-6.02, <br /> "Spreading," of the Standard Specifications, when ordered by the Engineer and not <br /> shown on the plans, will be paid for at the contract price for asphalt concrete; and also <br /> by force account to place asphalt concrete. <br /> When asphalt concrete (leveling) is shown on the plans but the contract does not <br /> include a contract pay item, asphalt concrete (leveling) will be measured and paid for as <br /> asphalt concrete. <br /> Full compensation for removing pavement markers shall be considered as <br /> included in the contract unit price paid for asphalt concrete and no separate payment <br /> will be made therefor. <br /> Paid frontages shall be sloped to drain when asphalt concrete frontages is <br /> shown on the plans but the contract does not include a contract pay item, asphalt <br /> concrete frontages will be measured and paid for as asphalt concrete. <br /> (SPECS.CDS\SSS39-A-P3) <br /> RTERRACE-Sss39-a-p3-RC <br />
The URL can be used to link to this page
Your browser does not support the video tag.