Laserfiche WebLink
S P E C- I A L P R O V I S I O N S <br /> Winter Weather Utility. Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish <br /> ul -•time supervision of all work, to insure .full compliance <br /> with the permit provisions. <br /> 2 . START OF' WORK: No work within the County right of way shall <br /> be starte until the utility company representative has 'made <br /> an evaluation of weather conditions and' ha' s determined the . <br /> work can be accomplished tinder the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections <br /> shall e re—s—t-o-r-e-ff daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, ditches an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br />