My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0506 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-0301 thru EP-08-0999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0506 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:49:33 AM
Creation date
12/30/2015 8:27:48 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-0506 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-0301 thru EP-08-0999
Year2
2008
Supplemental fields
Applicant
SAN JOAQUIN COMPANY
Contracts
CrossReference
Date Entered
3/22/2002
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF WEST 1 1 TH. ST. 150' E/O CHRISMAN RD.
Primary Parcel
Type (2)
PS-0800506
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S P E C- I A L P R O V I S I O N S <br /> Winter Weather Utility. Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish <br /> ul -•time supervision of all work, to insure .full compliance <br /> with the permit provisions. <br /> 2 . START OF' WORK: No work within the County right of way shall <br /> be starte until the utility company representative has 'made <br /> an evaluation of weather conditions and' ha' s determined the . <br /> work can be accomplished tinder the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections <br /> shall e re—s—t-o-r-e-ff daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, ditches an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.