My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0637
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-0301 thru EP-08-0999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-0301 thru EP-08-0999_ - EP-08-0637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:49:54 AM
Creation date
12/30/2015 8:54:55 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-0637
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-0301 thru EP-08-0999
Year2
2008
Supplemental fields
Applicant
PG&E
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF WASHINGTON ST. 140 W/O VISALIA CT.
Primary Parcel
PWP110005
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Special Conditions for <br /> ENCROACHMENT PERMIT -2- <br /> 14. Final trench <br /> paving shall be placed when the length of temporarily surfaced <br /> linear feet or by segment of road as determined by the County <br /> required to be placed when interruptions or delays of the work trench exceeds 1,500 <br /> . Final trench paving will also be <br /> 15. Roadway areas subject to exceed two (2) weeks. <br /> lay from <br /> the centerline pavement cuts shall receive a 0.12-foot as <br /> (or lane line) to the edge of the traveled way asphalt concrete bed o <br /> sides of the centerline (or adjacent lane), then the entire road <br /> resurfaced, If the pavement l disturbed l b both <br /> All pavement conforms shall be ground to provide a flush surface. <br /> grind and overlay within 10 working days of way (or affected lanes) shall be <br /> brought up to the finish permanent trench Contractor shall <br /> grade as directed by the County. paving. Shoulder areas shall be <br /> 16. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 17. School buses shall be <br /> Passed through the work zone with minimal dela <br /> gh the work zone. Y Children walking to <br /> school shall be escorted <br /> 18. Coordination with School shall be required to provide f <br /> off/pick Coordination <br /> periods, or school buses and <br /> Parents during drop- <br /> Off/Pick-up <br /> rop- <br /> 19. A report describing a public information campaign to inform affected residents and businesses shall <br /> 20. Frontages of commercial properties g work. be <br /> Public to the site. p perties shall not be blocked in a manner that restricts access of <br /> the <br />
The URL can be used to link to this page
Your browser does not support the video tag.