My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1105 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1105 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:51:33 AM
Creation date
12/30/2015 8:36:49 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1105 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
CHAREST CORP.
Contracts
CrossReference
Date Entered
4/3/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
E/S OF "B" ST. 20' S/O GERALD ST.
Primary Parcel
Type (2)
PS-0801105
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 24, 2008 <br /> MEMORANDUM <br /> TO: Tom Gau, Chief Deputy Director <br /> Development Services <br /> FROM: Michael Chung, Engineer V MG <br /> Public Services <br /> SUBJECT: (CHAREST CORPORATION) REQUEST FOR A WAIVER OF THE <br /> TRENCHING POLICY ON "B" STREET FOR THE PURPOSE OF <br /> CONNECTING SEWER LINE <br /> This memo is regarding a request from Charest Corporation for a waiver of the San <br /> Joaquin County Department of Public Works trenching policy. Charest Corp. is planning <br /> to install sewer line connection on `B" Street. `B" Street was recently paved, our policy <br /> does not allow for new pavement cuts. In order to mitigate for the trenching, Charest <br /> Corp. will line saw-cut, grind 1-1/2" and resurface the entire roadway from lip of gutter <br /> to lip of gutter and. (ten)10 feet to the north and (ten) 10 feet to the south from the edge of <br /> the trench as indicated on the attached Trench Detail Exhibit . <br /> Pete Martin from Design Engineering, David Mendoza from Field Engineering, and <br /> Tom Okamoto from Traffic Engineering have reviewed the encroachment application and <br /> concur with the work that is planned to be performed in `B" Street. <br /> My recommendation is to allow the applicant to place sewer line as stated above <br /> based on the proposed mitigation to grind 1-1/2" and resurface the recently resurfaced <br /> roadway to conform to the rest of the road. Any disturbed striping is to be replaced as it <br /> was before the work was performed. <br /> Approved b / <br /> PP Y <br /> 06? <br /> Attachments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.