My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 15072 <br /> HIGH DENSITY POLYETHYLENE PIPE <br /> involved. Butt fusion joining shall yield a joint strength equal to or greater than the tensile <br /> strength of the pipe. <br /> Flanged joining, or other mechanical joining methods specified, may be used to make <br /> connections to differing piping materials, to equipment, valves and other appurtenances, and <br /> where specified. <br /> C. Trench Excavation <br /> Trenches shall be excavated to ensure that sides will be stable under all working conditions. <br /> Trench walls or supports shall comply with all local and national standards for safety. <br /> D. Location and Alignment <br /> Pipe and fittings shall be placed in the trench with the invert conforming to the elevations, <br /> slopes, and alignments shown. <br /> E. Bedding and Backfill <br /> Materials used for bedding and backfill shall be as specified in Section 02210, <br /> EXCAVATION, BACKFILLING, AND COMPACTION FOR UTILITIES, and as shown. <br /> Place materials by methods that will not disturb or damage the pipe. All HDPE pipe shall be <br /> at the temperature of the surrounding soil at the time it is backfilled and compacted. Work <br /> in and tamp the bedding material in the area under the pipe and up to the spring line before <br /> placing and compacting the remainder of the embedment. Blocking under the pipe shall not <br /> be permitted. <br /> Use compaction equipment and techniques that are compatible with materials specified and <br /> location in the trench. Before using heavy compaction or construction equipment directly <br /> over the pipe, place sufficient backfill to prevent damage, excessive deflections, or other <br /> disturbances of the pipe. <br /> 3.03 TESTING <br /> A. General <br /> Testing of piping shall be as specified in Section 15060, PIPING SYSTEMS, and this <br /> section. In case of conflict, the requirements of this section shall prevail. <br /> B. Hydrostatic Pressure Testing <br /> 1. General: HDPE piping systems shall be fully pressure tested prior to covering the <br /> piping and placing the line into service. Water shall be the test medium for <br /> hydrostatically testing the pipe. Test procedures shall be as specified in Section 15060, <br /> Walnut Grove Sewer Project(Conformed) 15072-5 SAO]60401 <br /> March 2008 n:Vsa0160401\specs\wg con formvdiv 15vI5072.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.