Laserfiche WebLink
Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> SRCSD WALNUT GROVE SEWER PROJECT <br /> 24. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete overlay from <br /> the centerline (or lane line) to the edge of the traveled way. If the pavement is disturbed on both <br /> sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 25. All signs and striping shall be replaced with like kind after sections within the County right-of-way <br /> have been reconstructed. <br /> 26. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 27. Above ground ARV boxes and other similar facilities will be allowed within the right-of-way if <br /> located as far to the outside edge as possible and if the location either meets AASHTO Clear <br /> Zone guidelines or is protected by an existing obstruction such as a tree or utility pole. <br />