Laserfiche WebLink
SECTION 02100 <br /> SITE PREPARATION <br /> PART 1 — GENERAL <br /> 1.01 SCOPE <br /> This section specifies site preparation which consists of clearing, grubbing, demolition, <br /> and disposal of materials. <br /> 1.02 JOB CONDITIONS <br /> A. Existing Conditions <br /> The Contractor shall determine the actual condition of the site as it affects this portion of <br /> work. <br /> B. Protection <br /> Site preparation shall not damage structures, landscaping or vegetation adjacent to the site. <br /> The Contractor shall repair, or replace any damaged property to the satisfaction of the <br /> Construction Manager. To the maximum extent practicable, dust generated during <br /> construction activities shall be minimized as specified in Special Provisions Section SP-21, <br /> DUST CONTROL. Submit a dust control plan to the Construction Manager for approval in <br /> accordance with Special Provisions Section SP-08, SUBMITTALS. <br /> PART 2 - PRODUCTS <br /> Not used. <br /> PART 3 - EXECUTION <br /> 3.01 GENERAL <br /> The Contractor shall notify the Construction Manager when site preparation is complete. <br /> Further work shall not be started until the conditions defined herein are satisfied. <br /> Walnut Grove Sewer Project(Conformed) 02100-1 SAO 160401 <br /> March 2008 n:Asao160401\specs\wg conform\div 2\02100.doc <br />