My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02210 <br /> EXCAVATION,BACKFILLING,AND COMPACTION FOR UTILITIES <br /> E. Location of Excavated Materials <br /> During trench excavation, place the excavated material only within the approved working <br /> area. Do not obstruct any roadways or streets unless specified otherwise. Conform to all <br /> Federal, State, and local codes governing the safe loading of all trenches with excavated <br /> material. Excess materials shall become the property of the Contractor and shall be hauled <br /> off-site to a site approved by the Construction Manager. <br /> F. Maintenance of Roadways <br /> All earthwork operations shall be performed in a manner which does not disrupt the <br /> continuous flow of traffic or, existing roadways. <br /> G. Finish Grading <br /> Finished surfaces shall be smooth, compacted and free from irregularities. The degree of <br /> finish shall be that normally obtainable with a blade-grader. <br /> Finished grade shall be as specified by the contours plus or minus 0.10 ft except where a <br /> local change in elevation is required to match sidewalks, curbs, manholes and catch basins, <br /> or to ensure proper drainage. Allowance for topsoil and grass cover, and subbase and <br /> pavement thickness shall be made so that the specified thickness of topsoil can be applied <br /> to attain the finished grade. <br /> Where the soil is to be cultivated, rocks larger than 2-1/2 in. in maximum dimension, roots <br /> and other debris on the surface of the slope shall be removed and properly disposed of. <br /> H. Trench Dams <br /> Trench dams shall be constructed of CDF along the entire pipeline alignment including the <br /> Walnut Grove Wastewater Treatment Plant site. The Contractor shall place a cut off trench <br /> dam of CDF across and along the trench every 100 feet to retard and resist the movement <br /> of groundwater through the trench granular bedding or backfill material. The trench dam <br /> shall be located within the barrel section between the first and second joints from the end <br /> of the pipeline. The trench dams shall be a minimum 24 inches in length, as measured <br /> along the pipe centerline and shall be keyed into the trench walls a minimum 12 inches <br /> into undisturbed soil, and from the trench subgrade or stone foundation a minimum of 12 <br /> inches into undisturbed soil as indicated in Sacramento County Standard Detail 7-16. The <br /> height of the trench dam shall be a minimum of 24 inches above the top of the pipe. <br /> 3.02 BEDDING <br /> Bedding shall be of the materials and depths as indicated for utility lines and utility line <br /> structures. Place bedding in 6 in. maximum loose lifts and compact. Provide uniform and <br /> continuous support for each section of utility except at bell holes or depressions necessary <br /> Walnut Grove Sewer Project(Conformed) 02210-8 SA0160401 <br /> March 2008 n:\sa0160401\specs\wg conform\div 2\02210.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.