Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> At no time shall excess or residual materials be washed down to surface waters or storm <br /> drains. Note that permits being obtained by the District for these bores do not authorize any <br /> discharges to surface water, including drilling mud. <br /> The Contractor shall be fully responsible for taking all reasonable and necessary actions as <br /> required by the Contract Documents for preventing the potential for an inadvertent return, <br /> for minimizing the volume of any release, for maintaining full circulation of drilling fluids <br /> and for restoring circulation. The Contractor is responsible for the cleanup of all discharges <br /> of drilling fluids originating on land. <br /> 3.06 TRACKING WIRE PLACEMENT <br /> The Contractor shall submit plans showing proposed location for any tracking grid wire <br /> system that may be required. Approval must be obtained from the Construction Manager <br /> before any tracking wire is placed. <br /> The Contractor shall be responsible for avoiding impact to protected species and crops <br /> during placement of the grid wire system. The Contractor shall notify the Construction <br /> Manager a minimum of two working days prior to placement of any wire in the slough areas <br /> in order for an environmental specialist to be on site during placement. <br /> 3.07 PILOT HOLE <br /> The Contractor shall at all times provide and maintain instrumentation which will accurately <br /> locate the pilot hole and provide readings of inclination and azimuth; measure drill string <br /> axial and torsional loads; and measure drilling fluid discharge rate and standpipe pressure. <br /> A minimum of one reading shall be taken for each segment of drill pipe (approximately <br /> every 30 feet). The Contractor shall calculate and provide to the Construction Manager the <br /> depth, right and left position, and radius of curvature. A log of all recorded readings shall <br /> be maintained and will become a part of the record information to be supplied by the <br /> Contractor to the Construction Manager. The Contractor shall take all necessary provisions <br /> to eliminate interference from down hole tools, drill pipe, and magnetic fields. <br /> Entry and exit points shall be accurately located as shown on the plans. Should the achieved <br /> exit point location not meet with the required accuracy described in Paragraph 1.08, <br /> Engineering and Design, the Contractor shall withdraw the pilot stem and adjust the bore <br /> trajectory as required to meet the accuracy requirements. <br /> If a completed or partially completed drill hole is not in compliance with the Contract <br /> Documents, redrilling of all or any part of the hole will be required at no additional cost to <br /> the District. Any change in the drill profile and trajectory must be approved by the District. <br /> Walnut Grove Sewer Project (Conformed) 02310-15 SA0160401 <br /> March 2008 Nasa0160401\Specs\WG Conform\Dia 2\02310.doc <br />