My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> At no time shall excess or residual materials be washed down to surface waters or storm <br /> drains. Note that permits being obtained by the District for these bores do not authorize any <br /> discharges to surface water, including drilling mud. <br /> The Contractor shall be fully responsible for taking all reasonable and necessary actions as <br /> required by the Contract Documents for preventing the potential for an inadvertent return, <br /> for minimizing the volume of any release, for maintaining full circulation of drilling fluids <br /> and for restoring circulation. The Contractor is responsible for the cleanup of all discharges <br /> of drilling fluids originating on land. <br /> 3.06 TRACKING WIRE PLACEMENT <br /> The Contractor shall submit plans showing proposed location for any tracking grid wire <br /> system that may be required. Approval must be obtained from the Construction Manager <br /> before any tracking wire is placed. <br /> The Contractor shall be responsible for avoiding impact to protected species and crops <br /> during placement of the grid wire system. The Contractor shall notify the Construction <br /> Manager a minimum of two working days prior to placement of any wire in the slough areas <br /> in order for an environmental specialist to be on site during placement. <br /> 3.07 PILOT HOLE <br /> The Contractor shall at all times provide and maintain instrumentation which will accurately <br /> locate the pilot hole and provide readings of inclination and azimuth; measure drill string <br /> axial and torsional loads; and measure drilling fluid discharge rate and standpipe pressure. <br /> A minimum of one reading shall be taken for each segment of drill pipe (approximately <br /> every 30 feet). The Contractor shall calculate and provide to the Construction Manager the <br /> depth, right and left position, and radius of curvature. A log of all recorded readings shall <br /> be maintained and will become a part of the record information to be supplied by the <br /> Contractor to the Construction Manager. The Contractor shall take all necessary provisions <br /> to eliminate interference from down hole tools, drill pipe, and magnetic fields. <br /> Entry and exit points shall be accurately located as shown on the plans. Should the achieved <br /> exit point location not meet with the required accuracy described in Paragraph 1.08, <br /> Engineering and Design, the Contractor shall withdraw the pilot stem and adjust the bore <br /> trajectory as required to meet the accuracy requirements. <br /> If a completed or partially completed drill hole is not in compliance with the Contract <br /> Documents, redrilling of all or any part of the hole will be required at no additional cost to <br /> the District. Any change in the drill profile and trajectory must be approved by the District. <br /> Walnut Grove Sewer Project (Conformed) 02310-15 SA0160401 <br /> March 2008 Nasa0160401\Specs\WG Conform\Dia 2\02310.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.