Laserfiche WebLink
Section 15060 <br /> PIPING SYSTEMS <br /> PIPING SYSTEM SPECIFICATION <br /> SERVICE: BIOXIDE CHEMICAL SYMBOL: BIOX <br /> FLUID: WASTEWATER <br /> PRESSURE(PSIG) TEMPERATURE(°F) <br /> WORK: Pressure MAX: TEST: 5 NORMAL: 75 MAX: 85 <br /> TEST MEDIUM: WATER OR AIR TEST DURATION: 120 minutes <br /> PIPE AND FITTING SPECIFICATION <br /> SIZE EXPOSURE PIPE FITTINGS <br /> 3/4" Buried and PVC,ASTM D1784, Class 12454-B, PVC,ASTM D3034, Schedule 80 solvent <br /> Non-Buried Schedule 80, solvent weld connections per weld connections per Section 15070 <br /> Section 15070 <br /> GENERAL VALVE SPECIFICATIONS,UNLESS OTHERWISE SPECIFIED IN VALVE SCHEDULE <br /> SIZE EXPOSURE DUTY SPECIFICATION OPERATOR <br /> N/A N/A N/A N/A N/A <br /> REMARKS: 1. Coatings for pipe and fittings shall be in accordance with Section 09800,PAINTING AND SPECIAL <br /> COATING SYSTEMS. <br /> Walnut Grove Sewer Project(Conformed) 15060-12 SAO 160401 <br /> March 2008 n:\sa0160401\specs\wg conform\div 15\15060.doc <br />