Laserfiche WebLink
Section 15068 <br /> DUCTILE IRON PIPE <br /> 1.03 SUBMITTALS <br /> The Contractor shall submit information in accordance with Special Provisions Section <br /> SP-08, SUBMITTALS, to substantiate compliance with this specification. In addition, the <br /> following specific information shall be submitted. <br /> A. Shop Drawings <br /> Shop drawings of special fittings and manifolds. <br /> Alignment drawings (Contractor's layout drawings) with deviations from the plans clearly <br /> noted. <br /> B. Manufacturer's Data <br /> Manufacturer's name and catalog number. <br /> C. Certificates <br /> Certification that each length of pipe has been tested physically for ductility and has <br /> satisfactorily passed such tests. <br /> Certifications specified in the following documents, as applicable: <br /> AWWA C151, paragraph 51-4.2 <br /> ASTM A716, paragraph 4.2 <br /> AWWA C(10, paragraph 10-4.3 <br /> AWWA C111, paragraph 11-5.1 <br /> AWWA C115, paragraph 15-4.2 <br /> D. Specification Compliance <br /> A copy of this specification section, with addenda updates, and all referenced sections, with <br /> addenda updates, with each paragraph check marked to show specification compliance or <br /> marked to show deviation. <br /> A copy of the portion of Special Provisions Section SP-08, SUBMITTALS that applies to <br /> this submittal shall be neatly and clearly marked by a check mark or circled indicating it has <br /> been reviewed and, as a. minimum, complies with each requirement outlined or marked to <br /> show any deviation. <br /> Walnut Grove Sewer Project (Conformed) 15068-3 SAO 160401 <br /> March 2008 n:Asa0160401Vspecs\wgconform\diN 15\15068.doc <br />