Laserfiche WebLink
CALIFORNIA WATER SERVICE COMPANY STOCKTON DISTRICT <br /> M 1550 W. FREMONT ST. •SUITE 100 • STOCKTON, CA 95203-2660 <br /> 'ff� sr (209(547-79C0 • FAX (209 466-6155 <br /> July 17, 2008 <br /> Dear Customer: <br /> This letter is to inform you that California Water Service Company (Cal Water) is planning to <br /> begin a water system improvement project in your neighborhood during the month of July, 2008. <br /> This project will take approximately four to six weeks to complete. <br /> The purpose of this project is to install a new 8" water main in the north side of Washington <br /> Street from Coolidge Avenue to Walker Lane. Upon completion,the new facilities will improve <br /> water service throughout the area. <br /> Carl Crutchfield Construction Company Inc. will be performing the underground construction <br /> work under the supervision of Cal Water. Work is scheduled Monday through Friday between <br /> 7:00 a.m.and 4:00 p.m. <br /> Minor disruptions in water service during construction will be necessary to connect the new water <br /> mains to the existing water mains. One to two days notice, whenever possible, will be provided <br /> prior to any service interruption. <br /> There will be significant trenching for this project to install facilities. Trenches will be filled <br /> daily and temporary asphalt applied for safety and traffic concerns. Permanent paving of trenches <br /> will take place upon project completion. <br /> Also included in a project of this nature are re-connecting and/or installation of new service lines <br /> from the water main to the water meter. To do this, it sometimes becomes necessary to work in <br /> the front yard of those residences involved. Occasionally this work involves trimming bushes; <br /> disturbing lawn areas around meter boxes; altering landscaping, etc. in order to complete the <br /> project. Whenever this occurs, every effort will be made to leave yard areas as close to"original" <br /> as possible. <br /> If you have any questions or concerns regarding this project or would like any further information <br /> about this project,you can contact me at(209)464-8311. Also, if your property has a well onsite <br /> we would like to know before we begin our project. Thank you in advance for your cooperation <br /> and patience. <br /> Sincerely, <br /> PW <br /> Bret Dahlen <br /> Construction Superintendent <br /> Stockton District <br /> DISTRICT OFFICES: ANTELOPE. VALLEY • BAKERSFIELD• BAYSHORE • BEAR G'JLCH • CHICO • DIXON • EAST LOS ANGELES • KERN RIVER VALLEY • KING rITY <br /> —F1111-1.nenIIIIF•RANCHO DOMINGUEZ•REDWOOD VALLEY•SALINAS•SELMA.STOCKION•VISALIA.WESTLAKE•WILIO-S <br />