Laserfiche WebLink
_®1.0-(:3,8 <br /> C,,eJ <br /> REQUIRED MEASUREMENTS: - �za_ C-�" <br /> 9. RIGHT OF WAY(EDGE OF PAVEMENT, FACE OF CURB, ETC.) <br /> 2. CENTER LINE (EDGE OF PAVEMENT, FACE OF CURB, ETC.) <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4.STREET CUT TO CLOSEST X-STREET <br /> Y Gy <br /> � r <br /> t4' -� <br /> Tp cv°b <br /> R <br /> The excavation, construction, and/or otherwise encroachment will take place on Highway Right-of-Way on.the <br /> iJ side of ff" U.1 I �_ approximately 20 _ mile <br /> - <br /> of 5 , Prd�a,�Va-ev �- ►� <br />