Laserfiche WebLink
PNINTI- <br /> REQUIRED MEASUREMENTS: -1-0 C <br /> 9. RIGHT OF WAY(EDGE OF PAVEMENT, FACE OF CURB, ETC.) <br /> 2. CENTER LINE (EDGE OF PAVEMENT, FACE OF.CURB, ETC.) �U �? <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4.STREET CUT TO CLOSEST X-STREET <br /> ,,wW <br /> Z �a' <br /> V <br /> rrs�nn <br /> " uJ <br /> The excavation, construction, and/or otherwise encroachment will take place on Highway Right-of-Way on the <br /> side of approximately feet/mile <br /> of <br />