Laserfiche WebLink
REQUIRED MEASUREMENTS: Kj�:) <br /> 1. RIGHT OF WAY(EDGE OF PAVEMENT, FACE OF CURB, ETC.) , <br /> 2. CENTER LINE (EDGE OF PAVEMENT, FACE OF CURB, ETC.) <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4-STREET CUT TO CLOSEST X-STREET all <br /> d <br /> t <br /> ' 1 <br /> r <br /> v - <br /> . c <br /> V) <br /> h <br /> The excavation, construction, and/or otherwise encroachment will take place on Highway Right-of-Way on.the <br /> side of approximately feetimile <br /> Of <br />