Laserfiche WebLink
Stabilized Construction Roadway TC-2 <br /> Objectives <br /> EC Erosion Control ✓ <br /> SE Sediment Control ✓ <br /> TC Tracking Control <br /> WE Wind Erosion Control <br /> NS Non-Stormwater <br /> Management Control <br /> Waste Management and <br /> a u,a WM g <br /> Materials Pollution Control <br /> Legend: <br /> ;,. ✓ Primary Objective <br /> ✓ Secondary Objective <br /> A <br /> , <br /> Description and Purpose Targeted Constituents <br /> Access roads subdivision roads Sediment <br /> ,parking areas, and other onsite <br /> vehicle transportation routes should be stabilized immediately Nutrients <br /> after grading, and frequently maintained to prevent erosion and Trash <br /> control dust. Metals <br /> Bacteria <br /> Suitable Applications Oil and Grease <br /> This BMP should be applied for the following conditions: Organics <br /> ■ Temporary Construction Traffic: <br /> Potential Alternatives <br /> - Phased construction projects and offsite road access <br /> None <br /> - Construction during wet weather <br /> ■ Construction roadways and detour roads: <br /> - Where mud tracking is a problem during wet weather <br /> - Where dust is a problem during dry weather <br /> - Adjacent to water bodies <br /> - Where poor soils are encountered <br /> Limitations <br /> ■ The roadway must be removed or paved when construction is <br /> complete. <br /> CASGA <br /> llfornla <br /> Stormwater <br /> Quality <br /> Association <br /> January 2003 California Stormwater BMP Handbook_ 1 of 4 <br /> Construction <br /> www.cabmphandbooks.com <br />