My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3302
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-3001 thru EP-08-4000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:58:08 AM
Creation date
12/30/2015 11:11:14 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-3302
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-3001 thru EP-08-4000
Year2
2008
Supplemental fields
Applicant
ERIC SUCHOMEL
Contracts
CrossReference
Date Entered
10/17/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
E/S OF REPORT AVE. 1000' - 2500'S/0 WATERLOO RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Traffic Control Plan <br /> Soil Borings in Report Avenue Right-of-Way, Stockton, <br /> California <br /> The purpose of this procedure is to provide the guidelines to protect Geosyntec Consultants, Inc <br /> (Geosyntec). employees and contractors. The work zone for the field effort ' <br /> s located south of <br /> the intersection of Waterloo Avenue and Report Avenue in Stockton, California (Figure 1 The <br /> scope of work requiring a traffic control plan consists of advancing three (3) borings in the right- <br /> of-way adjacent to the east lane of Report Avenue. The borings will be advanced to a depth of 5 <br /> feet below ground surface using a hand-auger to collect soil samples. Geosyntec will be <br /> providing oversight of this work. Report Avenue is located in a residential area and has a speed <br /> limit of 25 miles per hour. <br /> Traffic Plan <br /> Whenever possible, place a work vehicle between your worksite and oncoming traffic. Not only <br /> is it a large, visible warning sign, but also if an oncoming car should fail to yield or deviate, the <br /> parked vehicle rather than your body would absorb the first impact of a crash. Turn the vehicle <br /> wheels so that if it was struck it would swing away from the worksite. In addition, proper PPE <br /> is to be worn during traffic operations, which includes steel-toed boots, a hard hat, and traffic- <br /> rated safety vest. <br /> When in traffic, place the work vehicle facing oncoming traffic and set the parking brake. Turn <br /> off the engine when possible. Always leave some room between the rear of the vehicle and the <br /> work zone. Even though. the vehicle would protect you in a crash, it might be knocked several <br /> feet backwards. Turn the headlights on (night or day). <br /> Use of Signs and Cones to Direct Traffic. Traffic signs and cones are used to direct traffic <br /> away from and around you. Cones and signs are effective only if they give oncoming drivers <br /> enough time to react and make it clear how traffic should react. The work zone is defined as the <br /> area extending from the southernmost to the northernmost proposed boring locations. <br /> Traffic Cones: On the east lane of Report Avenue (oncoming traffic side cones will be set at a <br /> maximum of 100 feet south of the work zone and 40 feet north of the work zone. Cones placed <br /> in between the tapered zones will be spaced ata maximum interval of 50 feet. A schematic of <br /> the traffic control plan is shown on the attached figure (Figure 2). <br /> Warning Signs: Warning signs will be placed ahead of and following the work zones to warn <br /> vehicles. Warning signs will be orange, a minimum of 36"x36" square, and equipped with a <br /> self-supporting base per CalTrans requirements. North of the work zone, a "Road Work Ahead" <br /> sin will be placed south of the intersection of Waterloo Avenue and Report Avenue, which is <br /> approximately 425 feet north of the northernmost boring location The sign will be placid in the <br /> right-of-way of the west lane of Re ort Avenue. Two sinswill be placed south of the work <br /> zone. A "Road Work Ahead" sign will be placed 1,000 feet south of the southernmost boring <br />
The URL can be used to link to this page
Your browser does not support the video tag.