My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3372
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-3001 thru EP-08-4000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:58:20 AM
Creation date
12/30/2015 11:12:18 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-3372
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-3001 thru EP-08-4000
Year2
2008
Supplemental fields
Applicant
S.S.J.I.D.
Contracts
CrossReference
Date Entered
10/27/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
ACROSS SEXTON RD., LAWRENCE RD. & BEELER RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
209)239-6225 <br /> MCR Enineerin Inc. '-k (209�239-8839 <br /> 9 �, 14242 Dupont Court <br /> Manteca. CA 55336 <br /> October 22, 2008 Job #08-068 <br /> San Joaquin County <br /> Scott Cooper <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Attn: Scott Cooper <br /> Project: South San Joaquin Irrigation District <br /> Lateral BE Improvements <br /> Subject: Roadway Crossings <br /> Dear Mr. Cooper, <br /> Enclosed is a revised set of improvement plans for the above mentioned project. We have <br /> addressed all of your comments. We would like to get these plans processed as soon as possible, <br /> so the contractor can begin to work. Please review the plans and notify MCR if there are any <br /> other corrections that need to be made to the plans. We offer the following explanations in <br /> response to your plan check comments. <br /> Sheet 1: We have added the requested abbreviations to the abbreviation list. <br /> Sheet 7: We have relocated the proposed 30" air vent outside the future 60' right-of-way. Also, <br /> we have added a note to all sheets within the county right-of-way that states the following: <br /> CONTRACTOR SHALL CONSTRUCT PIPELINE CROSSING BY UTILIZING A SINGLE <br /> LANE CLOSURE PER CALTRANS STANDARD T13. CONTRACTOR SHALL MAINTAIN <br /> A MINIMUM LANE WIDTH OF 11 FEET DURING CONSTRUCTION OF PIPELINE <br /> CROSSING. IN ORDER TO MAINTAIN 11 FOOT MINIMUM LANE WIDTH FOR SINGLE <br /> LANE CLOSURE, CONTRACTOR MAY HAVE TO INSTALL TEMPORARY PAVING AT <br /> THE SHOULDER. ALL PAVING IN COUNTY RIGHT OF WAY SHALL BE 3" AC OVER <br /> 6" AB PER THE TRENCH DETAIL SHOWN ON SHEET 2. ALL WORK IN THE COUNTY <br /> RIGHT OF WAY SHALL BE PER SAN JOAQUIN COUNT STANDARD PLANS AND <br /> SPECIFICATIONS, CALTRANS STANDARD PLANS AND SPECIFICATIONS, AND THE <br /> CALTRANS M.U.T.C.D. <br /> Sheet 10: We have added the note worded above. <br /> Sheet 13: We have added the note worded above. We have added a dimension from the face of <br /> the existing irrigation box (to remain in place) to the existing right-of-way (8.53'). <br /> Please contact me at my office if you have any questions. <br /> -Sincerely, <br /> � 7 <br /> Shawn L. amanie <br />
The URL can be used to link to this page
Your browser does not support the video tag.