Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-0803469 <br /> STOCKTON,CALIFORNIA 95201 Date Issued: 1 1/18/2008 <br /> } (209)468-3000 Exp. Date: 11/18/2009 <br /> FAX#(209)468-9324 <br /> Project No: PWP110005 <br /> APN No: 21205005 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: VERIZON WIRELESS <br /> 2009 V STREET <br /> SACRAMENTO, CA 95818 <br /> Location: 12352 W. LARCH RD.; S/S OF LARCH RD.990' E/O NAGLEE RD. <br /> In compliance with your request of , and subject to all the terms,conditions and restrictions written below or printed as general or special <br /> provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway approach w/pipe shown on <br /> Permit Application No. PS-0803469 Quad: SW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(12 inch) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE,AND PIPE ARCH <br /> CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br /> approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch) minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material (road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> THOMAS R. FLINN,Director <br /> Department of Public Works <br /> By <br /> Permi section <br /> FORMS: SS/WW,R-17 <br />