Laserfiche WebLink
Traffic Control Plan General Notes <br /> A. It is the responsibility of the contractor performing work on a public street to <br /> install and maintain the traffic control devices as shown herein, as well as any <br /> such additional traffic control devices as may well be required to insure the safe <br /> movement of traffic and pedestrians through or around the work area and provide <br /> maximum protection and safety to construction workers. <br /> B. All delineators shall be equipped with reflective band at night time. <br /> C. The contractor shall notify ft0Jo9 �W 3'aa�w�' <br /> of implementing any construction detour. at least five working days in advance <br /> D. All signs, delineators, barricades, etc. and their installation shall conform to the <br /> State of California Standard Specifications latest edition _and California <br /> Department of Transportation "Manual of Traffic Control, for Construction and <br /> Maintenance Work Zones" (Latest edition), and the Work Area Traffic Control <br /> Handbook (Watch, latest edition). <br /> 60O�qs tory <br /> E. � reserves tfe right to observe these traffic control plans in use to make <br /> any necessary changes as field conditions warrant. Any changes shall supersede <br /> these plans. Exact location of all equipment and all traffic control devices shall <br /> be determined by the Engineer. <br /> F. All traffic control devices, stripes, markings, legends, and raised pavement <br /> markers shall conform to Caltrans Traffic Manual. Maintenance Manual, <br /> Standard Plans, and Standard Specifications (most recent edition). <br /> G. All traffic control devices shall be kept in their proper position at all times, and <br /> shall be repaired, replaced, or cleaned as necessary to preserve their appearance <br /> and continuity. <br /> H. All traffic lanes shall have a minimum of 5 feet clearance from open excavations <br /> and a minimum of 2 feet from vertical obstructions. <br /> I• Contractor shall provide flaggers as deemed necessary by Engineer. <br /> J. Contractor shall notify all affected residents and businesses five working days <br /> prior to construction. <br /> K. All advanced warning signs shall be equipped with flags. <br />