Laserfiche WebLink
INSTfV_LATION OF UR <br /> SUBSFACE STRU(_TUkES AND PIPELINES WITHIN COUNTY ROAD RIGHTS-OF-WAY <br /> COIvVENIENCF ANDSAFE'TY: <br /> Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank <br /> �edestriau traffic to and from the road. ,equipment or other barrier permitted for any <br /> r) Before <br /> period of time,the Per nittee shaia notify the known users of the respective thoroughfare(s)involved,and shall provide access for vehicular and <br /> 1 Unless otherwse permitted,all work shall be conducted in such a manner that no less than one lane of the existino <br /> County road traveled way mzi cases <br /> w open a public traffic dieing working hours in a smooth and safe riding conditio¢(s).Two lanes shall b ope after workig hours will be <br /> ?. In cases where road closure is peinutted,the permission to close the road will be granted under the condition that the Permittee notify the following <br /> persons and/or agencies of the time:,the period Works <br /> closure,and the detour route at least twenty-four(24)hours prior to said road closure. <br /> z.The County of San Joaquin Public Works Departme¢t d.The local fire district <br /> L.The County of San Joaquin Sheriffs Office <br /> c.The local postal service - e.The local school district <br /> l residents involved <br /> b Should hazardous conditions relative f the installation operations warrant flagmen,as mE The any capable flgmea as may be necessary shall be provided <br /> C. the Permittee and stationed in advance of work to warn and direct traffic. <br /> C. Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with <br /> particular attention to be taken in this regard after dark <br /> D. Any excess dirt and/or debris which might be <br /> removed from the job site daily. a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be <br /> II. STRUCTURES: <br /> a Walls structures shall be such quality and strength that they will resist all pressures and will n <br /> hazard or maintenance problem at any time.Theot crack or be deformed in such a way as to create a <br /> refore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall <br /> conform to the following American Association of State Highway and Transportation Officials(AASHTO)designations, <br /> on <br /> I.For concrete pipe up to and including thirty-tbree inches(33")inside diameter,extra strength concrete pipe conforming to AASHTO Designation M 170M. <br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO desi <br /> 3.Plastic pipe conforming to AASHTO Designation M 294. gnation M 170M Class III. <br /> B. All concrete pipe joints within County road rights-of-way shall be sealed against leakage and/or infiltration with rubber gasket in conformance with <br /> Section 65-1.06 of the California Standard Specifications,or with other methods as may permitted under the Special Provisions. <br /> C. Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County road <br /> rights-of-way unless specifically so stated in the:Special Provisions,and only under the conditions as provided. <br /> D. All structures to be buried within the County road rights-of-way shall beset at such elevations as to allow minimum coverage of thirty inches(30")to <br /> the centerline of the roadways and twelve inches(12')at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established <br /> below a flat plane extending across the rights-of-way, as <br /> nearly <br /> shall extend above the elevations stated above;manholes,lampho(es,valves.etc.not <br /> included.Future surface elevations shall he anticipated as nearly as possible and structure elevations shall be established for future adjustment accordingly. <br /> be installed <br /> E. The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvanized corrugated meta(pipe that is to <br /> F. All longitudinal utility facilities are to be established(and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of-way <br /> (border)lines. <br /> I. REPAIRS OF THE COUNTY RIGH '-OF-WAY: <br /> A. All excavations shall be backfilled and compacted immediately after work therein has been completed. <br /> b Trenches shall not be left open farther than.300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted <br /> B.the Engineer. <br /> C. Unless otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in such a manner that the relative <br /> compaction throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench Detail. <br /> D. Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot is the bedding region,one foot <br /> where 90%compaction is required,and two feet where 80%compaction is required. <br /> F.E. No portion of the excavation(s)shall be compacted by ponding or jetting unless a maintenance bond is provided. <br /> in Gravel backfill materia(shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a high-frequency <br /> internal o vibrator,the compactor to be a size and type approved by the Engineer.Points of compactiou shalt be not greater than 18"centers and to the full <br /> depth of the lift. <br /> G. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,road signs,trees,shrubbery,and/or other permanent road facilities <br /> impaired by or as a result of construction operations at the construction site(s),or at other grounds)occupied by materials and/or equipment,shall be <br /> restored immediately upon backfilling of the excavation to the original <br /> to constructionFades and cross sections,and to a condition as good as,or better than existing prior <br /> H. All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within <br /> ONE WEEK following the backfilling of excavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing,and ao <br /> less than two inches(2")of asphalt concrete over six inches(6")of aggregate base,both as specified below, <br /> 1.Asphalt Concrete:Combined minara(aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum <br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bituminous binder to be mixed with <br /> mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt <br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")maximum size aggregate <br /> Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications <br /> I. Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the <br /> construction areas left in a neat and presentable condition(:;). <br /> I. If necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust. <br /> 2.Drivewaythe County,any settlement�Sa <br /> approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the EngineerJ. Upon . <br /> the Permutteeefor atpenod Of ne year fol owing acceptangxof u face,or cracking of pavement shall be repaired immediate) b <br /> y y and at the sole expense.o€ <br />