Laserfiche WebLink
COUNTY OF SAN JOA <br /> QUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1000894 <br /> STOCKTON,CALIFORNIA 95201 Date Issued:05/06/2010 <br /> " _ - , <br /> (209)468-3000 Exp. Date: 11'15/2010 <br /> 15/2010 <br /> FAX#(209)468-9324 Project No: PWPI 10005 <br /> Quad: SW <br /> ENCROACHMENT PERMIT UE/CR/PM NO:30772032 <br /> To: PG& f; <br /> PO BOX 930 <br /> STOCKTON,CA 95201 <br /> Encroachment Type: <br /> Bell Hole --r— _ <br /> Location: - — — -- _ <br /> W/S OF MOUNTAIN HOUSE PKWY.o S/W CORNER OF SCHULTE RD. <br /> In compliance with your request of 05/06/2010,permission is hereby granted to do work in County right-of=way as shown on attached <br /> application and subject to all the terms, conditions and restrictions written below or printed as general or special provisions on any part of <br /> this form. See reverse side and attached sheet,if any. <br /> Trench excavations for service connections will not be permitted within ten feet(10')of pavement centerline unless otherwise approved by <br /> the Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall <br /> be given to depth of utilities through roadside area in anticipation of future drainage facilities, road profile and/or frontage development. <br /> All underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of <br /> way,or from right of way(border) lines. <br /> Permittee shall call the Department of Public Works,Field Engineering Division at(209)95;-7421 (Permits Inspections)at least <br /> forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform to the <br /> rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided,placed and <br /> maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br /> After completion of the work permitted herein,all debris, lumber, barricades,or anv excess material shall be removed and the jobsite left <br /> in a neat workmanlike manner. Immediately following completion of construction permitted herein. Permittee shall fill out and mail notice <br /> of completion (see attached post card)provided by Grantor. <br /> Special Comments: <br /> Traffic Control Per MUTCD- Emergency Repair - <br /> I <br /> FORMS: iSS/WW, R-29 L_ —r ---� <br /> i <br /> Est. Permit Fee: $260.00 <br /> THOMAS R. FLINN, Director <br /> wttrrr= -Permitee De�partment of Public Works <br /> GOLDENROD -PWD Central Filc <br /> YELLOW -Field lnspectior. <br /> PtN1; <br /> Permit SectionBy:� <br /> ' <br /> ; �. <br /> ---- - --- <br /> d ' Pe it Section <br />