ESA. <br /> CJrrV f-%7F7 <br /> MANTECA <br /> - PUBLIC WORKS DEPARTMENT <br /> ENCROACHMENT PERMIT REQUIREMENTS <br /> The City of Manteca Public Works Department requires that each contractor shall follow requirements set forth below <br /> while working on or near the public right of way. Noncompliance with the following items may result in the stoppage of <br /> work and/or the revoking of the encroachment permit. <br /> L SIGNING: <br /> A. All signing must conform to the most current edition of the Manual of Traffic Controls for Construction and <br /> Maintenance Work Zones. <br /> B. Signs shall be placed on traffic standards(flag trees)or fixed to permanent posts. Flags shall be inserted in <br /> traffic standards. PL�4CEMENT OF SIGNS ONBARRICADES IS FORBIDDEN. <br /> C. Signs in the work zone will be maintained at all times. <br /> D. Signs shall be clean and Iegible. <br /> E. Flaggers will wear orange vests and hard hats at all times and use stop and slow paddles. Paddies will be held by <br /> flaggers. Paddles will not be placed in cones or on barricades. Flaggers will not do any other work than <br /> flagging- <br /> F. A worksite traffic plan shall be submitted for review to the Traffic Engineer seventy-two(72)hours prior to <br /> commencement of work. No work will begin until the worksite traffic plan has been accepted and signed off by <br /> the City Engineer. <br /> II. CONSTRUCTION: <br /> A. Your attention is directed to the general provisions listed on the back of the encroachment permit. <br /> B. Street cuts,where portions of the street paving have been removed,will be cold patched at the and of the <br /> working day. <br /> C. Streets will be swept clean at the end of each worl6g day to the satisfaction of the City Engineer. <br /> D. No construction materials are to be stacked in public right of way unless permitted by the City Engineer. <br /> E. Water permits are required for each construction project.Only approved fire hydrant wrenches may be used to <br /> draw water from City fire hydrants. AllRater trucks shall have approved air gaps. <br /> F. All final inspection repairs are to be completed within five(5)working days upon receipt of list. <br /> G. Show proof of City of Manteca business license prior to issuance of encroachment permit <br /> I am an officerof mp and ve read the above requirements and understan Lth�e gulations as stated. <br /> NAME: DATE:� <br /> COMPANY: <br /> 1001 W. CENTER 5T. MANTECA,CA 95337 (209)239-8460 FAX(209)239-8495 <br />