Laserfiche WebLink
SPECIAL CONDITIONS FOR <br /> FARM ST. - FRANKLIN HIGH SCHOOL <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Contractor shall follow the Traffic Control Plan approved by <br /> San Joaquin County Traffic Engineering. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications. <br /> 5. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 6. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 7. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to one-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 8. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 9. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 10. The Contractor shall coordinate with San Joaquin County Field Engineering in regards to the <br /> reconstruction of the County portion of Farm Street. <br /> 11. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br />