My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2010_PS-1001500 thru PS-1002000_ - PS-1001809
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2010
>
PS-1001500 thru PS-1002000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2010_PS-1001500 thru PS-1002000_ - PS-1001809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:46:45 PM
Creation date
12/30/2015 7:53:43 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1001809
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2010\PS-1001500 thru PS-1002000
Year2
2010
Supplemental fields
Applicant
LODI UNIFIED SCHOOL DISTRICT
Contracts
CrossReference
Date Entered
8/26/2010
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1001809 <br /> fl {' STOCKTON,CALIFORNIA 95201 Date [sued:08/26/2010 <br /> (209)468-3000 Exp. Date: 08/26/2011 <br /> FAX#(209)468-9324 <br /> Proiect No: PWPI 10005 <br /> APN No: 08660009 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: LODI UNIFIED SCHOOL DISTRICT <br /> Location: 5383 E. EASTVIEW DR.;N/S OF EASTVIEW DR. 1300' W/O FREESIA AVE. <br /> In compliance with your request of 08/26/2010,and subject to all the terms.conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct Two driveway w/sidewalk and curb widening shown on <br /> Permit Application No. PS-1001809 Quad: MOR <br /> Jobsite shall be kept in a safe condition at ail times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights. signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP)SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications.ALTERNATIVE PIPE <br /> AND PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient <br /> length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es). include flares for turning and/or paved frontage(s). from the edge of roadway pavement to <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch)Six inch minimum of <br /> compacted laver of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approa.ch(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shalt be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris, lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> ztf, fnt �> 0 PIA, IS ire nnder`af)t: I" 1� s tirll 0 :� <br /> pproach at this time. 1ioweyer, if in the fut11rt1 <br /> it is determined by the Countv that pipe will be <br /> required at this location,it shall he the respopsi_ TH01AAS R. FLINN,Director <br /> 1)ility of the property owner to supply needed Department of Public Works <br /> pipe per Cou;it� reouirements. <br /> B ' <br /> Permit section <br /> FORMS: FR-1 SS7R S/WVIW' SEE ATTACHED DRAWINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.