Laserfiche WebLink
k. COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> 9•� .a <br /> P.O. BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1001862 <br /> j' STOCKTON.CALIFORNIA 95201 Date Issued:08/31/2010 <br /> J <br /> (209)468-3000 Exp. Date: 03!01/2011 <br /> FAX#(209)468-9324 Project No: PWP110005 <br /> Quad: ES <br /> UE/CR/PM NOA1353305 <br /> ENCROACHMENT PERMIT <br /> To: PACIFIC GAS& ELECTRIC-STOCKTON <br /> PO BOX 930 <br /> STOCKTON.CA 95201 <br /> Encroachment Type: <br /> Bell Hole <br /> Location: <br /> E/S OF GERTRUDE AVE.494'N/O MAIN ST. <br /> In compliance with your request of 08/31/2010,permission is hereby granted to do work in County right-of-way as shown on attached <br /> application and subject to all the terms, conditions and restrictions written below or printed as general or special provisions on any part of <br /> this form. See reverse side and attached sheet, if any. <br /> Trench excavations for service connections wil I not be permitted within ten feet(10')of pavement centerline unless otherwise approved by <br /> the Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall <br /> be given to depth of utilities through roadside area in anticipation of future drainage facilities, road profile and/or frontage development. <br /> All underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of <br /> way,or from right of way(border) Iines. <br /> Permittee shall call the Department of Public Works,Field Engineering Division at(209)953-7421 (Permits Inspections)at least <br /> forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform to the <br /> rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided,placed and <br /> maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br /> After completion of the work permitted herein,all debris, lumber,barricades,or any excess material shall be removed and the jobsite left <br /> in a neat workmanlike manner. Immediately following completion of construction permitted herein, Permittee shall fill out and mail notice <br /> of completion(see attached post card)provided by Grantor. <br /> Special Comments: <br /> Traffic Control Per MUTCD <br /> i <br /> FORMS: �S/WW, R-29 <br /> Est. Permit Fee: 5413.00 <br /> THOMAS R. FLINN, Director <br /> Department of Public Works <br /> WHITE -Permitee <br /> GOLDENROD -PWD Central t=ile ' <br /> YELLOW" -f=ield InspectionBy. <br /> I ,✓ <br /> INK -Permit Section. _--- <br /> ,f' P it Section <br />