My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2010_PS-1001500 thru PS-1002000_ - PS-1001869
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2010
>
PS-1001500 thru PS-1002000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2010_PS-1001500 thru PS-1002000_ - PS-1001869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:46:51 PM
Creation date
12/30/2015 7:51:07 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1001869
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2010\PS-1001500 thru PS-1002000
Year2
2010
Supplemental fields
Applicant
REEVES SAND AND GRAVELS INC.
Contracts
CrossReference
Date Entered
8/31/2010
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF MCDONALD RD. 1/2 MILE W/O BOULTON RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stabilized Construction Entrance/ Exit TC-1 <br /> ■ If aggregate is selected, place crushed aggregate over geotextile fabric to at least 12 in. depth, <br /> or place aggregate to a depth recommended by a geotechnical engineer. A crushed aggregate <br /> greater than 3 in.but smaller than 6 in. should be used. <br /> ■ Designate combination or single purpose entrances and exits to the construction site. <br /> ■ Require that all employees, subcontractors, and suppliers utilize the stabilized construction <br /> access. <br /> ■ Implement SE-7, Street Sweeping and Vacuuming, as needed. <br /> ■ All exit locations intended to be used for more than a two-week period should have stabilized <br /> construction entrance/exit BMPs. <br /> Inspection and Maintenance <br /> ■ Inspect and verify that activity—based BMPs are in place prior to the commencement of <br /> associated activities. While activities associated with the BMPs are under way, inspect <br /> weekly during the rainy season and of two-week intervals in the non-rainy season to verify <br /> continued BMP implementation. <br /> ■ Inspect local:roads adjacent to the site daily. Sweep or vacuum to remove visible <br /> accumulated sediment. <br /> ■ Remove aggregate, separate and dispose of sediment if construction entrance/exit is clogged <br /> with sediment. <br /> ■ Keep all temporary roadway ditches clear. <br /> ■ Check for damage and repair as needed. <br /> ■ Replace gravel material when surface voids are visible. <br /> ■ Remove all sediment deposited on paved roadways within 24 hours. <br /> ■ Remove gravel and filter fabric at completion of construction <br /> Costs <br /> Average annual cost for installation and maintenance may vary from $1,200 to $4,800 each, <br /> averaging $2,400 per entrance. Costs will increase with addition of washing rack, and sediment <br /> trap. With wash rack, costs range from $1,200 - $6,000 each, averaging $3,600 per entrance. <br /> References <br /> Manual of Standards of Erosion and Sediment Control Measures,Association of Bay Area <br /> Governments, May 1995. <br /> National Management Measures to Control Nonpoint Source Pollution from Urban Areas, <br /> USEPA Agency, 2002. <br /> Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in <br /> Coastal Waters, Work Group Working Paper, USEPA,April 1992. <br /> ianuar., 2003 f alifnrnia Stnrmwater RMP Handbook 3 of 6 <br /> uu., --..._....- - <br /> __water <br /> www.cabmphandbooks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.