Laserfiche WebLink
construction stage and the permanent traffic control devices shall be restored by the <br /> contractor upon completion of project. <br /> M. Contractor shall replace/repair all damage striping with temporary striping or raised <br /> pavement markers at end of each working day. <br /> N. Contractor shall cover or remove all conflicting signs. <br /> O. Contractor shall post "symbol" uneven lanes, "Steel Plates Ahead" or "Bump" signs, for <br /> pavement surface disruptions of Y, inch or greater. Pavement disruptions of I inch or <br /> greater shall have beveled edge of four (4) horizontal to one (1) vertical. <br /> P. Contractor shall install "CAUTION STEEL PLATES AHEAD" and/or "ROUGH ROAD" signs in <br /> advance of steel plate bridging. <br />