Laserfiche WebLink
REQUIRED MEASUREMENTS. <br /> 1.RIGHT OF WAY(EDGE OF PAVEMENT,FACE OF CURB,ETC.) <br /> 2.CENTER LIME (EDGE OF PAVEMENT, FACE OF CURE,ETC.) <br /> 3,OUR FACILITIES TO NEAREST EDGE <br /> 4.ST EET CUT TO CLOSEST X-ST EET <br /> r <br /> S <br /> d <br /> 1110 <br /> l� <br /> v <br /> The 6xi�avation,cohstru ton,and/or otherwise encroachment will take place on Highway Right-of-Way on the <br /> (J side of 1v' d''� approximately ��feetlmite <br /> of IF o (.'-5 y mac. tic, V'c <br /> #: s4csn. <br />