Laserfiche WebLink
COUNTY OF <br /> SAN JOAQUIN <br /> i = ( DEPARTMENT OF PUBLIC WORKS <br /> •;` P.O. BOX 1810-118 10 E. HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 Permit leo: PS-1002100 <br /> _ Date Issued:09/30/2010 <br /> (209)468-3000 Exp. Date: I I/15/2010 <br /> FAX#(209)468-9324 Project No: PWPI 10005 <br /> Quad: NW <br /> ENCROACHMENT PERMIT UE/CR/PM NO:30775304 <br /> To: PACIFIC GAS&ELECTRIC- WALNUT CK. <br /> 3751\1. WIGET LN. #250375 N. WIGET LANE. SUITE 250 <br /> WALNUT CREEK, CAWALNUT CREEK, CA 9459894598 <br /> Encroachment Type: <br /> Bore(up to 6 inch Dia) <br /> Location <br /> W/S OF LOWER SACRAMENTO RD. 1/4 MILE N/O WOODBRIDGE RD. <br /> In compliance with your request of 09/30/2010,permission is hereby granted to do work in Countyrim <br /> application and subject to all the terms,conditions and restrictions written below or printed as general or special' <br /> this form. See reverse side and attached sheet, if any. right-of--way as shown on attached <br /> P provisions on any part of <br /> Trench excavations for service connections will not be permitted within ten feet(101)of pavement centerline unless <br /> otherwise approved byp <br /> the Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall <br /> be given to depth of utilities through roadside area in anticipation of future drainage facilities,road profile and/or fronts e deve <br /> All underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road ri <br /> way, or from right of way(border)lines. g lopment. <br /> ght of <br /> Permittee shall call the Department of Public Works, Field Engineering Division(Permit Inspections) <br /> _ forty,-eight hours prior to beginning any work within the County right of way. All work performed <br /> to the rules and regulations pertaining to safety established by the California Division at(209)953-7421 at least <br /> P d under this permit shall conform <br /> of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal ofany excess dirt or de <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel <br /> maintained r and at the sole expense of necessary <br /> Permittee in accordance with the gates debris which might be a hazard n either <br /> t edition of the CALTRANS Manual of placedand <br /> Control. <br /> After completion of the work permitted herein.. all debris, lumber,barricades,or any excess material shall <br /> in a neat workmanlike manner. Immediately following completion of construction permitted herein. Permittee s <br /> Of completion (see attached post card be removed and the jobsite left <br /> P )provided by Grantor. hall fill out and mail notice <br /> Special Comments: <br /> Traffic Control Per MUTCD <br /> FORMS: SSS/WW, R-29 ----_i <br /> Est. Permit Fee: $413.00 <br /> THOMAS R. FLINN, Director <br /> wtLD -Permitec DeDartment of Public Works <br /> ., <br /> YELLOW <br /> -PWD Centra!File F:I,LO -Field Inspection. <br /> PfNK -Permit Section By: <br /> Pe t Section <br />