Laserfiche WebLink
Special Conditions for <br /> SIGNALIZATION OF HARNEY LN. / HWY 99 <br /> FRONTAGE RD. ENCROACHMENT PERMIT -2- <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 14. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 15. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 16. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 17. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> Y:\Encroachments\Encroachment Permits\Special conditions&plan check comments\Signalization Harney Ln and Frontage Rd <br />