Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1002715 <br /> STOCKTON. CALIFORNIA 95201 Date Issued: O 1/04,'201 1 <br /> (209)468-3000 � �� <br /> Exp. Date: O 1 04_012 <br /> FAX#(209)468-9324 <br /> Project No: PWPI 10005 <br /> APN No: 00.538007 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: GRISCHOTT, FRED& KELLIE <br /> 9115 ASHBURN DR. <br /> STOCKTON, CA 95209- <br /> Location: 2833 CALIMYRNA RD.;N/S OF CALIMYRNA RD.350'AND 850' E/O WOODSON RD. <br /> In compliance with your request of 12/30/2010,and subject to all the terms,conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct One drivewav w/o pipe.One driveway with pipe shown on <br /> Permit Application No. PS-1002715 Quad: NW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(18 inch) inside diameter per section 62 of the current Caltrans Standard Specifications.ALTERNATIVE PIPE AND PIPE ARCH <br /> CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br /> approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway pavement to <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch) minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material (road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> ) .11 nol to <br /> THOMAS R. FLINN,Director <br /> Department f Public Works <br /> By <br /> FORMS: SS/WW,R-17__ Permit se ion <br />