Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> ' DEPARTMENT OF PUBLIC WORKS <br /> 4+' P.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 Permit No: PS-1101087 <br /> Date Issued:06/10/2011 <br /> (209)468-3000 Exp. Date: 06/09/2012 <br /> FAX#(209)468-9324 Extended To: 11/01/2012 <br /> APN No: 18106033 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: THOMAS DOUCETTE <br /> P.O.BOX 30873 RIDER <br /> -�STOCKTON,CA 95213 <br /> Date G 13 �Z- <br /> Location: 12090 E.MARIPOSA RD.; S/S OF MARIPOSA RD. 1/2 MILE W/O JACK TONE RD. <br /> In compliance with your request of 06/10/2011, and subject to all the terms,conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway approach w/pipe shown on <br /> Permit Application No.PS-1101087 Quad: SE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(12 inch)Twelve inch inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND <br /> PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficien <br /> clear toe of approach t length to <br /> fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch)Four inch minimum <br /> of compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate <br /> Base specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> Permittee shall call the Department of Public Works,Field Engineering Division(Permit Inspections)at(209)953-7421 at least <br /> forty-eight hours prior to beginning any work within the County right of way. After completion of the work permitted herein,all <br /> debris,lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The <br /> Permittee shall till out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> THOMAS M.GAU,Director <br /> Department of Public Works <br /> By <br /> FORMS: R-17, SS/WW Pe it section <br />