Laserfiche WebLink
Special Conditions for <br /> WID—ARMSTRONG ROAD _2_ <br /> ENCROACHMENT PERMIT <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 13. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 14. School buses shall be passed through the work zone with minimal delay. <br />