Laserfiche WebLink
ti!i ry <br /> COUNTY OF SAN JOAQUIN <br /> i •�� DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1100902 <br /> STOCKTON,CALIFORNIA 95201 Date Issued: 05/12/2011 <br /> (209)468-3000 Exp. Date: 05/11/2012 <br /> FAX#(209)468-9324 <br /> APN No: 179.56046 <br /> D-RIVEWAY ENCROACHMENT PERMIT <br /> To: O BRIEN, MARK T ETAL <br /> 5101 FLORIN PERKINS RD <br /> SACRAMENTO CA 95826- <br /> Location: 3303 CARPENTER RD.; E/S OF HWY 99 FRONTAGE RD. 172'N/O CARPENTER RD. <br /> In compliance with your request of 05/12/2011,and subject to all the terms,conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway approach w/pipe shown on <br /> Permit Application No. PS-1 10090:?Quad: SE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(24 inch)Twenty-Four inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE <br /> PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maiAND <br /> maintenance and shall be of sufficient le <br /> clear toe of approach fill or headwalls. AND <br /> to <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch Sixinchemi pavement to <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material road ) minimum of <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a fourinch(4')minimum of Portland cement Class 2 tcco ncret Base <br /> If Portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and alon rroe lin <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. p e <br /> Permittee shall call the Department of Public Works,Field Engineering Division(Permit Inspections)at(209)953-7421 at <br /> forty-eight hours prior to beginning any work within the County right of way. After completion of the work permitted herein,least <br /> debris,lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The all <br /> Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Drivewav(s) shall be complete prior to occupance- of the residence, <br /> but not to exceed expiration date,. <br /> THOMAS M. GAU,Interim Director <br /> Department f Public Works <br /> lay <br /> FORMS: R-l7,SSLWW P I section <br /> i <br />