Laserfiche WebLink
05/13/2011 12:57 2094540195 <br /> PAGE 03/03 <br /> rtvc <br /> REgUIRED MEASUREMENTS: <br /> 1. RIGHT OF WAV(EDGE OF PAVEMENT, FACE OF CURB,ETC.) <br /> 2. CENTER LINE (EDGE OF PAVEMENT,FACE OF CURB, ETC.) � X <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4.STREET CUT TO CLOSEST X-STREET <br /> 3a' <br /> The excavation,construction,and/or otherwise encroachment will take place on Highway Right-of-Way on the <br /> - �side of <br /> of approximately 1� �g male <br />