My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101001 thru PS-1101500_ - PS-1101222
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101001 thru PS-1101500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101001 thru PS-1101500_ - PS-1101222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:54:22 PM
Creation date
12/30/2015 7:06:25 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101222
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101001 thru PS-1101500
Year2
2011
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC-STOCKTON
Contracts
CrossReference
Date Entered
6/17/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF DE VRIES RD. S/O KINGDON RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1101222 <br /> � STOCKTON,CALIFORNIA 95201 Date Issued:06/17/2011 <br /> + (209)468-3000 <br /> Exp. Date: 09/15/2011 <br /> FAX#(209)468-9324 Project No: PWP730052 <br /> Quad: NW <br /> ENCROACHMENT PERMIT UE/CR/PM N0:30843654 <br /> To: PACIFIC GAS&ELECTRIC-STOCKTON <br /> PO BOX 930 <br /> STOCKTON,CA 95201 <br /> Encroachment Type: <br /> Bell Holes Bores(up to 6 inch Dia <br /> Location: <br /> W/S OF DE VRIES RD.S/O KINGDON RD. <br /> In compliance with your request of 06/17/2011 ,permission is hereby granted to do work in County right-of-way as shown on attached <br /> application and subject to all the terms,conditions and restrictions written below or printed as general or special provisions on any part of <br /> this form. See reverse side and attached sheet,if any. <br /> Trench excavations for service connections will not be permitted within ten feet(10')of pavement centerline unless otherwise approved by <br /> the Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall <br /> be given to depth of utilities through roadside area in anticipation of future drainage facilities,road profile and/or frontage development. <br /> All underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of <br /> way,or from right of way(border) lines. <br /> Permittee shall call the Department of Public Works, Field Engineering Division(Permit Inspections)at(209)953-7421 at least <br /> forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform <br /> to the rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided,placed and <br /> maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br /> After completion of the work permitted herein,all debris,lumber, barricades,or any excess material shall be removed and the jobsite left <br /> in a neat workmanlike manner. Immediately following completion of construction permitted herein,Permittee shall fill out and mail notice <br /> of completion(see attached post card)provided by Grantor. <br /> special Comments: <br /> Traffic Control Per MUTCD <br /> FORMS: SS/W W, R-29 <br /> Est. Permit Fee: $1,204.00 <br /> THOMAS M. GAU, Director <br /> WHITE. -Permitee Depa ent of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PMI' -Permit Section By: <br /> Permi Section <br />
The URL can be used to link to this page
Your browser does not support the video tag.