Laserfiche WebLink
LV J404U.L J'j U-jL MAIL' <br /> REQUIRED MEASUREMENTS <br /> 1. RIGHT OF WAY(EDGE OF PAVEMENT, FACE OF CURB., ETC.) <br /> 2. CENTER LINE (EDGE OF PAVEMENT,FACE OF CURB, ETC.) <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4.STREET CUT TO CLOSEST.X-STREET <br /> r <br /> 1 <br /> The excavation,construction,and/or otherwise encroachment will take place on Highway Right-of-Way on the <br /> side of VJ� 1_0. approximately Z C'7 ee iie <br /> of - <br /> Sim / �r � <br />