Laserfiche WebLink
IN, :N <br /> COUNTY OF SAN JOAQUIN <br /> �' {I DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1101392 <br /> /{ STOCKTON,CALIFORNIA 95201 Date Issued: 05/16/2012 <br /> (209)468-3000 Exp.Date: 05/16/2013 <br /> FAX#(209)468-9324 Extended to: 10/31/2014 <br /> Project No: PWPII0005 <br /> APN No: 01718012 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: DELTA BUILDINGS,INC. <br /> 151 TADDEI R.D. <br /> ACAMPO,CA 95220 RIDER <br /> w <br /> Date <br /> Location: 10171 E.ACAMPO RD.;N/S OF ACAMPO RD. 1400'E/O BUCK RD. <br /> In compliance with your request of ,and subject to all the terms,conditions and restrictions written below or printed as general or special <br /> provisions on any part of this form. <br /> Permission is hereby granted to construct Two driveways w/o pipe shown on <br /> Permit Application No.PS-1101392 Quad:NE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br /> vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br /> accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br /> approach fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch) minimum of compacted <br /> layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base specified in <br /> Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. Surface <br /> grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be. allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> THOMAS GAU,Director <br /> Department of Public Works <br /> No pipe is required under and across driveway <br /> approach at this time. However,if in the future B <br /> FORMS: SS/WW,R-17 it is determined by the County that pipe will be <br /> Permit section <br /> required at this location,it shall be the responsi- <br /> bllity of the property owner to supply needed <br /> pipe per County requirements. <br />