My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101001 thru PS-1101500_ - PS-1101442
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101001 thru PS-1101500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101001 thru PS-1101500_ - PS-1101442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:55:17 PM
Creation date
12/30/2015 10:48:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101442
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101001 thru PS-1101500
Year2
2011
Supplemental fields
Applicant
SHARP, KURT D & LISA M
Contracts
CrossReference
Date Entered
7/22/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF JACOBS RD. 800' W/O INLAND DR.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TC.1 <br /> ■ If aggregate is selected,place crushed <br /> or p€ace aggregate to a depth recon aggregate over geot e fabric to at least 12 in. depth. <br /> Brea ter than 3 in. but smaller thanm n. should be used n engineer. A crushed aggregate <br /> e Desi nate combination or single purpose entrances and exits to the cons <br /> Req'Idre that all employees, subcontractors,and suppliersu truct2on site. <br /> = <br /> accea>s. <br /> til ze the stabilized construction <br /> ■ Implement SE-7, Street Sweeping and Vacuuming,as needed <br /> ' All E.Kit locations intended to be used for more than a two-weekriod <br /> con.traction entrance/exit BMPs. Pe should have stabilized <br /> Inspection and Maintenance <br /> ffi Inspect and verify that activity—based <br /> asso:fated activities. While activbit es associated wits are in h the BMPs are under way,commencement inspectof <br /> weeHy during the rainy season and of two-week intervals in the non-rainy season <br /> continued BMP implementation. .o verify <br /> ' InsP`ct local roads adjacent to the site daily. Sweep or vacuum to rem <br /> accu::anulated sediment. ave visible <br /> ■ Rem ave aggregate, separate and dispose of sediment if construction entrance/exit is c <br /> with sediment. logged <br /> ' Keep all temporary roadway ditches cleat. <br /> ■ Cheek for damage and repair as needed. <br /> s Replace gravel material when surface voids are visible. <br /> 3 Reml)ve all sediment deposited on paved roadwayswithin 24 hours. <br /> ■ Remove gravel and filter fabric at completion of construction <br /> Costs <br /> Average,annual cost for installation and maintenance may vary from 1 <br /> averaging $2,400 per entrance. Costs will increase with addition of washing r $4 800 each, <br /> trap. With wash rack, costs range from$1,200- $6,00o each, averaging , rack, and sediment <br /> References g g $3,600 per entrance. <br /> Manual f:)f Standards of Erosion and Sediment Control Measures _ <br /> Governr:eats, May 1996• ,-Association of Bay Area <br /> National Management Measures to Control Nonpoint Source Pollution from <br /> USEPA�.gency, 2002. Urban Areas, <br /> Proposed,Guidance Specifying Management Measures for Sources o <br /> Coastal 141aters, Work Group Working Paper, USEPA,April 1 2 f Nonpoint <br /> 99 <br /> P � Pollution in <br /> January 2003 .:. <br /> Catlforn-a S#oEcr ra er B P Handbook <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.