My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101532
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101501 thru PS-1102000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:55:27 PM
Creation date
12/30/2015 11:46:39 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101532
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101501 thru PS-1102000
Year2
2011
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - SACRAMENTO
Contracts
CrossReference
Date Entered
9/1/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF ORCHARD RD. 50' E/O DUSTIN RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 14. Final trench paving shall be placed when the length of temporarily surfaced trench exceeds 1,500 <br /> linear feet or by segment of road as determined by the County. Final trench paving will also be <br /> required to be placed when interruptions or delays of the work exceed two (2) weeks. <br /> 15. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 16. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 17. School buses shall be passed through the work zone with minimal delays. <br /> 18. Work within County right-of-way shall be coordinated with the agricultural harvest periods as <br /> determined by the County. No work within County right-of-way shall be permitted during <br /> identified agricultural harvests without prior authorization by the County. <br /> 19. Above ground ARV boxes and other similar facilities will be allowed within the right-of-way if <br /> located as far to the outside edge as possible and if the location either meets AASHTO Clear <br /> Zone guidelines or is protected by an existing obstruction such as a tree or utility pole. Utility <br /> vaults shall be located a minimum of 4'-0" from edge of pavement. <br /> 20. Drainage ditches shall remain open and in pre-construction condition at the end of each work <br /> day. <br /> 21. Above normal dust control measures, streets shall be maintained in a clean condition, free of dirt, <br /> mud and debris during construction activities. The contractor shall provide daily, or as needed, <br /> street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 22. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.